400 N. Harrison Street
Alpine, TX 79830 · Texas State University System
Museum of the Big Bend renovation planned in Alpine
A renovation at the Museum of the Big Bend will move its existing map room from the basement to gallery space to create a Texas map research center. The TDLR project registration was filed on March 24, 2025, and lists water-infiltration work and accessibility compliance. The applicant estimates the 10,000-square-foot project at $1.4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 24, 2025
- since Mar 24, 2025
- Largest scope
- 10,000 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
Finishing up · inspection nextSul Ros State University - Museum of the Big Bend Renovation
10,000 sq ft · $1.4M est.
- RegisteredMar 24, 2025
- Plan review
- ConstructionMar '25 – Sep '25
- Inspectednow
- Closed
Scheduled to finish Sep 30, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRelocate the existing map room from the basement to the existing gallery space to create a new texas map research center, resolve water infiltration, and accessibility compliance — museum of the big bend
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$1.4M est.- Project #
- TABS2025014906
- Tenant / owner
- Sul Ros State University - Museum Of The Big Bend Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 400 N. Harrison Street
What is being built at 400 N. Harrison Street in Alpine?
A renovation is planned at the Museum of the Big Bend. It will move the existing map room into gallery space to create a Texas map research center.
Is a Texas map research center coming to the Museum of the Big Bend?
The project description says the renovation will create a Texas map research center by relocating the existing map room from the basement to gallery space.
What work is planned at the Museum of the Big Bend?
The registered work includes relocating the map room, addressing water infiltration, and meeting accessibility requirements. The project is listed as a renovation and alteration.
When was the Museum of the Big Bend renovation filed?
The TDLR registration, project TABS2025014906, was filed on March 24, 2025. Its status is listed as Review Complete.
How much will the Museum of the Big Bend renovation cost?
The applicant's estimated cost is $1.4 million for the 10,000-square-foot project.
What's being renovated near Texas State University System in Alpine?
The Museum of the Big Bend renovation is planned at 400 N. Harrison Street, about 184 meters from the Texas State University System landmark listed at 1202 E. Avenue B.
Also being built nearby
All of 79830- 1202 E. Avenue B · Texas State University SystemJul 15, 2025Sul ross state university - francois fine arts building — renovation/alteration — renovation of an existing pre-engineered metal building into a performing arts center with a black box theater, music rehearsal room, costume shop, dressing rooms & support spaces · 184 m away
- 291 South Cockrell St · Chaparral & Co LLCSep 4, 2026Fwtoboathouse — new construction — metal building to serve as bunk/storage/ 482 sq’ pro shop and office · 589 m away