11653 E FM 917
Alvarado, TX 76009 · Lift-Texas Construction LLC
Office and storage infill planned for Alvarado metal building
A 7,314-square-foot tenant infill for new office space and low-hazard storage was registered for an existing pre-engineered metal building at 11653 E FM 917. The Texas Department of Licensing and Regulation record was filed September 26, 2024, and lists Lift Texas Construction as the project name. The applicant estimated the project cost at $250,000; the record lists the project status as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2024
- since Sep 26, 2024
- Largest scope
- 7,314 sf
- Estimated cost
- $250K
- state registration
Where this project stands
CompletedLift Texas Construction
7,314 sq ft · $250K est.
- RegisteredSep 26, 2024
- Plan review
- ConstructionOct '24 – Mar '26
- Inspected
- Closed
Ran as a 17-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectExisting pre-engineer metal building tenant infill for new office and low-hazard storage — lift texas
TDLR project registrationRenovation/AlterationProject Closed7,314 sq ft$250K est.- Project #
- TABS2025001846
- Tenant / owner
- Lift Texas Construction
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11653 E FM 917
What is being built at 11653 E FM 917 in Alvarado?
A tenant infill for new office space and low-hazard storage is registered for the existing metal building. The project covers 7,314 square feet.
Who is the project at 11653 E FM 917 for?
The TDLR project registration is named Lift Texas Construction and describes the tenant infill as being for Lift Texas.
When was the 11653 E FM 917 project filed?
The Texas Department of Licensing and Regulation record was filed September 26, 2024.
How large is the Lift Texas Construction project in Alvarado?
The project registration lists 7,314 square feet for the tenant infill.
What is the estimated cost of the project at 11653 E FM 917?
The applicant's estimated cost is $250,000. This is an estimate for the project, not a confirmed final cost.
Is the 11653 E FM 917 project still active?
The TDLR record lists the project's status as closed. The record does not give further details about the meaning of that status.