734 S. Taylor St
Amarillo, TX 79107 · Toot' N Totum
Toot' N Totum convenience store planned for S. Taylor Street
A new 5,275-square-foot Toot' N Totum convenience store with a drive-up window and an eight-pump fueling island is planned at 734 S. Taylor St. Its TDLR project registration was filed on August 13, 2024, and lists the project status as closed. The applicant's estimated project cost is $3.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 13, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2024
- since Aug 13, 2024
- Largest scope
- 5,275 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
CompletedToot' n Totum - N. Taylor & Amarillo Blvd.
5,275 sq ft · $3.5M est.
- RegisteredAug 13, 2024
- Plan review
- ConstructionOct '24 – Jul '25
- Inspected
- Closed
Ran as a 10-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction of a new 5,275 sq ft convenience store with a drive up window and a fueling island with 8 gas pumps. — toot' n totum
TDLR project registrationNew ConstructionProject Closed5,275 sq ft$3.5M est.- Project #
- TABS2024025329
- Tenant / owner
- Toot' N Totum - N. Taylor & Amarillo Blvd.
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 734 S. Taylor St
What is being built at 734 S. Taylor St. in Amarillo?
A 5,275-square-foot Toot' N Totum convenience store with a drive-up window and a fueling island with eight gas pumps is listed in TDLR registration TABS2024025329, filed August 13, 2024.
Is a new gas station planned at 734 S. Taylor St.?
The TDLR project description includes a fueling island with eight gas pumps as part of the new Toot' N Totum convenience store. The registration lists the project status as closed.
When was the Toot' N Totum project on S. Taylor Street filed?
The TDLR project registration was filed August 13, 2024. Its registration number is TABS2024025329.
How big is the new Toot' N Totum in Amarillo?
The planned convenience store is listed at 5,275 square feet. The description also specifies a drive-up window and eight gas pumps.
What's being built near Centennial Bank at 701 S. Taylor?
A new Toot' N Totum convenience store is planned at 734 S. Taylor St., about 37 meters from Centennial Bank, according to the project facts. The registration describes a 5,275-square-foot store and an eight-pump fueling island.
How much is the Toot' N Totum project on S. Taylor Street estimated to cost?
The TDLR registration lists an estimated project cost of $3.5 million. This is the applicant's estimate for the project.
Also being built nearby
All of 79107- 701 S Taylor · Centennial BankAug 1, 2024Hsb renovations for: pantex-basement — renovation/alteration — renovations for tenant finish-out including moving walls, new flooring and paint, and modifying exisitng electrical and mechanical systems · 37 m away
- 701 S Taylor St · Centennial BankJul 24, 2026Hsb renovations for pantex suite 100 — renovation/alteration — tenant improvement including new flooring, updating lighting, adding new offices and reworking hvac accordingly · 37 m away
- 724 South Polk Street · Kamp Hotels - 724 S Polk Street Operating, LLCNov 19, 2026Interior alteration of an existing, occupied 107-room hotel (courtyard by marriott amarillo downtown, historic fisk building) under the marriott pip. no change of use, no added floor area, and no change to room layouts, accessible room count or route · 112 m away
- 700 S. Polk Street · Sans Limites LLCSep 8, 2026Kress building renovation and adaptive reuse — renovation/alteration — renovation and adaptive reuse · 114 m away
- 800 S. Polk St · Parkhill, Smith & Cooper, Inc.Jul 29, 2026Parkhill amarillo office interior renovation and expansion — renovation/alteration — renovation of offices · 136 m away
- 113 SW 8th Ave · 113 SW 8th AveMay 3, 2024Ralph ellis downtown office renovation — renovation/alteration — renovate existing office and new facade / site access · 147 m away
- 602 S. Taylor · Amarillo National BankSep 9, 2026Amarillo national bank taylor street parking lot upgrades — renovation/alteration — new sidewalks, landscaping, street lights · 151 m away
- 625 S. Polk St · Dubs DevelopmentDec 29, 2023Six car pub kitchen renovations — renovation/alteration — new kitchen equipment and exhaust; additional kitchen space for expo · 159 m away
- 102 S.e. 9th Ave · Highland Park ISDApr 8, 2024New baseball/softball fields for highland park isd — new construction — construct baseball/softball fields · 216 m away
- 905 S. Fillmore · Gsec Porperties, LLCNov 27, 2025Gsec suite 101 — renovation/alteration — interior remodel · 231 m away
- 905 Filmore · Golden Spread Electrical CoopOct 17, 2024Mondern aviation — renovation/alteration — interior remodel of 4747 sq ft no new plumbing · 231 m away
- 600 S Tyler StDec 21, 2020Gas relay or repair with test · 271 m away
More gas stations & car washes in 79107, retail spaces in 79107.