101 W. Abram St

Arlington, TX 76010 · Pwsw25002 2026 Miscellaneous Sidewalk And Ada Ramps At Various Locations, Pwst23004: Residential Rebuild Phase 1(carla Ave To Cloudcroft Dr) + 5 more

Arlington registers citywide sidewalk and ADA ramp work

Arlington registered sidewalk and ADA ramp projects serving locations across the city, including Brown Boulevard and the Carla Avenue-to-Cloudcroft Drive area. The registrations were filed from February 24 through July 20, 2026; the latest describes work at various locations, including safe-route-to-school requests.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 20, 2026

Projects
7
7 filings
Latest filing
Jul 20, 2026
since Mar 26, 2024
Largest scope
61,650 sf
Estimated cost
$1.2M
state registration

Where this project stands

In state plan review

PWSW25002 2026 Miscellaneous Sidewalk and ADA Ramps at Various Locations

61,650 sq ft · $992K est.

  1. RegisteredJul 20, 2026
  2. Plan reviewnow
  3. ConstructionOct '26 – Oct '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

7 projects
  1. Construct ada facilities such as sidewalks, handicap ramps, etc., address safe route to school request, and general sidewalk request throughout the city of arlington. — arlington city hall

    TDLR project registrationNew ConstructionProject Registered61,650 sq ft$992K est.
    Tenant / owner
    Pwsw25002 2026 Miscellaneous Sidewalk And Ada Ramps At Various Locations
    Design firm
    Pro
    Contact
    Pro
  2. 4-inch thick reinforced concrete sidewalks – 2,760 sy totaling $207,000 ada compliant barrier free ramp (txdot ped-18) – 36 ea totaling $90,000 = 24,842 sq ft — city of arlington hall

    TDLR project registrationRenovation/AlterationReview Complete24,840 sq ft$297K est.
    Tenant / owner
    Pwst23004: Residential Rebuild Phase 1(carla Ave To Cloudcroft Dr)
    Design firm
    Pro
    Contact
    Pro
  3. Installation of sidewalks and ada pedestrian ramps on brown blvd from north collins to approximately 150 feet east of meandering way (see attached miscellaneous for more). — arlington city hall

    TDLR project registrationNew ConstructionReview Complete11,790 sq ft$349K est.
    Tenant / owner
    Pwsw23001: Brown Boulevard Sidewalk Improvements (n. Collins St To Hidden Ridge Drive)
    Design firm
    Pro
    Contact
    Pro
  4. Reconstructing sidewalks and handicap ramps and installation of new sidewalks and ramps to address ada issues, safe route to school request, and general sidewalk request throughout the city of arlington. — arlington city hall

    TDLR project registrationRenovation/AlterationProject Closed36,000 sq ft$1.2M est.
    Tenant / owner
    Pwsw24001: 2024 Miscellaneous Sidewalk & Ada Ramp At Various Location
    Design firm
    Pro
    Contact
    Pro
  5. COA SECURITY UPGRADES

    Replacement and upgrades to security devices; added security intervention materials; added interior partitions and doors. — arlington city hall

    TDLR project registrationRenovation/AlterationReview Complete1,100 sq ft$600K est.
    Tenant / owner
    Coa Security Upgrades
    Design firm
    Pro
    Contact
    Pro
  6. Replacement of interior partitions, doors and finishes. relocation of lighting and air devices. addition of electrical power and switches. — arlington city hall

    TDLR project registrationRenovation/AlterationProject Closed3,350 sq ft$400K est.
    Tenant / owner
    Water Admin Furniture And Office Improvements
    Design firm
    Pro
    Contact
    Pro
  7. Constructing a new roadway including sidewalk, driveway's, curb ramps, streetlights. and traffic signals. — center street row

    TDLR project registrationNew ConstructionProject Closed66,276 sq ft$650K est.
    Tenant / owner
    Pwst19007 - Center Street (bardin Road To Green Oaks Boulevard)
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 101 W. Abram St

What is being built at 101 W. Abram St. in Arlington?

The records associated with this address describe sidewalk and ADA ramp projects at various Arlington locations, not construction confined to 101 W. Abram St. The latest registration, TABS2026025644, was filed July 20, 2026.

Are new sidewalks being built in Arlington?

Yes. Arlington registered sidewalk and ADA ramp work, including projects on Brown Boulevard and in the Carla Avenue-to-Cloudcroft Drive area. The registrations were filed February 24 and March 16, 2026.

What is the 2026 sidewalk and ADA ramp project in Arlington?

The July 20, 2026 registration, TABS2026025644, covers sidewalks and ADA facilities at various city locations and mentions safe-route-to-school and general sidewalk requests. The applicant's estimated project cost is $992,000.

Where are the Brown Boulevard sidewalk improvements?

The registered project covers Brown Boulevard from North Collins Street to approximately 150 feet east of Meandering Way. TABS2026013328 was filed February 24, 2026.

What's being built near the City Secretary Office Renovation?

The nearby records include Arlington sidewalk and ADA ramp projects, but their descriptions place the work at various city locations, on Brown Boulevard, and between Carla Avenue and Cloudcroft Drive—not specifically at the City Secretary Office. The office renovation is listed at 101 W. Abram St.

Is the sidewalk work near Game Theory on East Front Street?

The records identify Game Theory at 200 E. Front St. as a nearby landmark, but do not say the sidewalk projects are taking place there. The registered work is described at other Arlington locations, including Brown Boulevard and the Carla Avenue-to-Cloudcroft Drive area.

Also being built nearby

All of 76010

More offices in 76010, schools & daycares in 76010.