3311 SW Green Oaks Blvd
Arlington, TX 76017 · City Of Arlington Parks And Recreation Department
Al Rollins Neighborhood Park Phase 1 improvements
Al Rollins Neighborhood Park Phase 1 is a renovation project with demolition, earthwork, paving, utility and drainage work, retaining walls, steps, and playground equipment. The project was registered with the Texas Department of Licensing and Regulation on April 21, 2025; its listed status is Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 21, 2025
- since Apr 21, 2025
- Largest scope
- 58,800 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Finishing up · inspection nextAl Rollins Neighborhood Park Phase 1
58,800 sq ft · $1.2M est.
- RegisteredApr 21, 2025
- Plan review
- ConstructionJun '25 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectDemolition, earthwork, vehicular concrete paving, pedestrian concrete paving, decomposed granite paving, utilities, storm drainage, concrete mowedge, retaining wall, concrete steps, playground equipment, poured-in-place s — al rollins park
TDLR project registrationRenovation/AlterationReview Complete58,800 sq ft$1.2M est.- Project #
- TABS2025017138
- Tenant / owner
- Al Rollins Neighborhood Park Phase 1
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3311 SW Green Oaks Blvd
What is being built at 3311 SW Green Oaks Blvd in Arlington?
The Al Rollins Neighborhood Park Phase 1 project includes park improvements such as paving, utilities, storm drainage, retaining walls, concrete steps, and playground equipment. It is listed as a renovation/alteration.
What work is planned for Al Rollins Neighborhood Park?
The project description lists demolition, earthwork, vehicle and pedestrian paving, decomposed granite paving, utilities, storm drainage, retaining walls, concrete steps, and playground equipment.
When was the Al Rollins Neighborhood Park project filed?
The project was registered with the Texas Department of Licensing and Regulation on April 21, 2025.
How much will the Al Rollins Neighborhood Park project cost?
The TDLR registration lists an estimated project cost of $1.2 million. This is the applicant's estimate, not a reported final cost.
What is the status of Al Rollins Neighborhood Park Phase 1?
The TDLR project registration lists the status as Review Complete. It does not provide a construction schedule or opening date.