4425 FM 2931

Aubrey, TX 76227 · Reflection Park, Aubrey Fire Station #3 And Police Substation Construction

Reflection Park memorial plaza and sidewalk in Aubrey

A small memorial plaza with a memorial sign, planting, irrigation and about 130 feet of sidewalk is being installed south of the existing fire station at 4425 FM 2931. The project was registered with TDLR on October 14, 2026; its status is listed as inspection complete.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 14, 2026

Projects
2
2 filings
Latest filing
Oct 14, 2026
since Oct 14, 2026
Largest scope
2,000 sf
Estimated cost
$7.0M
state registration

Where this project stands

Inspected · closing out

Reflection Park

2,000 sq ft · $111K est.

  1. RegisteredOct 14, 2026
  2. Plan review
  3. ConstructionAug '26 – Nov '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Reflection Park

    A small memorial plaza with a memorial sign are being installed south of existing fire station with approx. 130lf of sidewalk to connect to the existing parking lot with planting and irrigation. — reflection park

    TDLR project registrationAdditions to Existing BuildingInspection Complete2,000 sq ft$111K est.
    Tenant / owner
    Reflection Park
    Design firm
    Pro
    Contact
    Pro
  2. New fire station and police substation. site improvements — aubrey fire station #3 and police substation

    TDLR project registrationNew ConstructionInspection Complete12,000 sq ft$7.0M est.
    Tenant / owner
    Aubrey Fire Station #3 And Police Substation Construction
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 4425 FM 2931

What is being built at 4425 FM 2931 in Aubrey?

A small memorial plaza with a memorial sign is being installed south of the existing fire station. The project also includes about 130 feet of sidewalk connecting to the existing parking lot, along with planting and irrigation.

When was the Reflection Park project registered?

The TDLR project registration, TABS2027003520, was filed on October 14, 2026. Its status is listed as inspection complete.

How much sidewalk is part of the Reflection Park project?

The project description calls for about 130 linear feet of sidewalk connecting the plaza to the existing parking lot.

What is the estimated cost of Reflection Park in Aubrey?

The TDLR registration lists an estimated project cost of $110,500. This is the applicant's estimate for the project.

Is Reflection Park near Palomino on FM 2931?

Yes. The project address is about 320 meters from Palomino at 4621 FM 2931.