11501 Spirit Dr
Austin, TX 78617 · Cross Moceri
Austin reviews Spirit Drive industrial site plan
An industrial project is proposed at 11501 Spirit Dr, according to an Austin site plan case filed Nov. 12, 2026. The case, named Spirit Drive Industrial, is In Review. City records also show subdivision cases for Spirit Drive 2D and Lots 1 and 2; the records provided do not specify building size or project cost.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Austin
Questions about 11501 Spirit Dr
What is being built at 11501 Spirit Dr in Austin?
Austin records show a site plan case named Spirit Drive Industrial, filed Nov. 12, 2026, with a status of In Review. The records do not provide building details.
Has the Spirit Drive industrial project been approved?
The Spirit Drive Industrial site plan case was listed as In Review on Nov. 12, 2026. The records provided do not show an approval.
When was the site plan for 11501 Spirit Dr filed?
The City of Austin case for Spirit Drive Industrial was filed Nov. 12, 2026. Its case number is 13673078.
Are there subdivision plans for Spirit Drive?
Yes. City records include several Spirit Drive 2D subdivision cases, along with cases for Lot 1, Block B and Lot 1, Block C, filed in September and October 2026.
How large is the proposed industrial project at 11501 Spirit Dr?
The records provided do not list a square-footage figure for the Spirit Drive Industrial site plan.
How much will the Spirit Drive industrial project cost?
The records provided do not include a project cost estimate or reported valuation.
Also being built nearby
All of 78617- 11505-1/2 Spirit DrOct 20, 2026Spirit dr industrial 2 · 88 m away
- 11600 Spirit DrOct 31, 2025Presidium at velocity · 211 m away
- 3720 Foundry AveMay 8, 2026Block 7 · 267 m away
- 11500 Canvas LnDec 22, 2025New construction for retail food and beverage shell buildings (buildings 1 2a and 2b) concurrent review (sp-2024-0216c) · 304 m away
- 3326 SH 71 SvrdNov 17, 2026Velocity crossing phase 2 · 346 m away
- 11700 Canvas LnMay 1, 2026Block 3 · 374 m away
- 3311 FM 973 RdJun 7, 2008Eastbourne crossing · 452 m away
- 3725 FM 973 RdJan 21, 2022Velocity technology center subdivision, lot 1 · 468 m away
- 3518 S FM 973 RdMay 27, 2025Provide and install ats switch and docking station for: jesse colunga building 600a 120/208v modify service to set up ats and docking stations. add underground feeders and wire add main circuit breaker as needed. etj-existing service- per ec they are upgrading service 5/27/2025 · 531 m away
- 3518 FM 973 RdDec 22, 2016New del valle south community center · 531 m away
- 3725-1/2 FM 973 RdOct 30, 2026Velocity channel restoration · 580 m away
- 3208 SH 71 SvrdMar 2, 2007Speedy stop 202 · 597 m away