5545 El Molino Cir
Austin, TX 78617
5545 El Molino Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 5545 El Molino Cir, Austin, TX 78617. The most recent, filed May 2, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated May 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 2, 2025
- since May 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 29, 2025
- IssuedMay 2, 2025
- WorkMay '25 – Mar '26
- Final inspectionMar 20, 2026
Passed final inspection Mar 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-052537 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5545 El Molino Cir
What is being built at 5545 El Molino Cir?
The latest filing (City of Austin permit 2025-052537 MP, May 2, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5545 El Molino Cir have?
1 filing across 1 project, from May 2, 2025 to May 2, 2025.
Is there other construction near 5545 El Molino Cir?
Yes. Nearby filings include 5717 Paseo Nuevo Cir (deerwood manufactured home development, Mar 2, 2007); 5462 El Molino Cir (for mobile home with epmp and pp decks are 4x4 and 8x8 80sqft, May 7, 2025); 12320 Laguardia Ln (express: replacing 8 existing windows and rear sliding door like for like, Jul 13, 2026).
How do I get alerts for new permits at 5545 El Molino Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78617- 5717 Paseo Nuevo CirMar 2, 2007Deerwood manufactured home development · 75 m away
- 5462 El Molino CirMay 7, 2025For mobile home with epmp and pp decks are 4x4 and 8x8 80sqft · 127 m away
- 12320 Laguardia LnJul 13, 2026Express: replacing 8 existing windows and rear sliding door like for like · 141 m away
- 12312 Laguardia LnSep 25, 2025Express - foundation repair- installing 26 exterior pilings & 9 interior pilings · 156 m away
- 12302-1/2 Pearce LnDec 13, 2024Longview offsite utilities phase 2 · 171 m away
- 11330 Los Arboles CirMay 15, 2025Permit for the mobile home with trades eppp and mp. the decks are 4x4 and 8x8 =80 sq ft · 175 m away
- 12534 Descanso CirAug 21, 2025Install level 2 ev charger · 192 m away
- 5405 Marengo PlAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 205 m away
- 12444 Laguardia LnOct 30, 2026Base: installing a backup battery system and additional meter socket · 205 m away
- 5901 Los Dios PlMay 8, 2026Excavate and access damaged drain system by coordinating with bats foundation to tunnel approximately 15 from the exterior of the home to the garage area. expose the broken 3 wye fitting where the kitchen sink and laundry line connect to the main sewer line. remove the damaged section and install new pvc fittings and piping to complete a proper repair with correct alignment and slope. ensure sufficient exposure of piping to allow for a secure and code-compliant repair. excavate and expose an additional break located at the cleanout exiting the home. remove damaged components and install a new cleanout assembly and/or piping as needed to restore functionality and integrity. perform a full system retest upon completion of repairs to confirm system integrity. coordinate and schedule required inspection(s) as needed. and excavate and access damaged drain system by coordinating with bats foundation to tunnel approximately 10 from the exterior of the home to the garage area. expose the broken 3 offset on the main drain line. remove the damaged section and install new pvc fittings and piping to complete a proper repair with correct alignment and slope. ensure sufficient exposure of piping to allow for a secure and code-compliant repair. perform a full system retest upon completion of repairs to confirm system integrity. coordinate and schedule required inspection(s) as needed · 217 m away
- 5905 Los Dios PlJun 26, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.88 kw · 226 m away
- 5721 Las Alas TrlJun 14, 2024Install of 25 roof mounted solar paneles 9.875 kw-dc / 9.15 kw-ac · 232 m away