6633 Moores Crossing Blvd
Austin, TX 78617 · Atx 130 Bldg. 2
Made In America Manufacturing office build-out in Austin
Made In America Manufacturing is building out tenant office space in a previously permitted office/warehouse at 6633 Moores Crossing Blvd. The 77,813-square-foot project was registered with TDLR on February 3, 2026; a separate warehouse electrical permit was filed May 7, 2026.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated May 7, 2026
- Projects
- 7
- 7 filings
- Latest filing
- May 7, 2026
- since Dec 15, 2023
- Largest scope
- 77,813 sf
- Estimated cost
- $800K
- state registration
Where this project stands
FinaledNew service for warehouse 1600 amp meter can. approved espa attached
- AppliedApr 2, 2026
- IssuedMay 7, 2026
- WorkMay '26 – Jun '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
7 projectsNew service for warehouse 1600 amp meter can. approved espa attached
New service for warehouse 1600 amp meter can. approved espa attached
City of Austin permitElectrical PermitFinal- Record
- 2026-039696 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tenant office build out to a previously permitted office / warehouse space. — atx 130 building. 2
TDLR project registrationRenovation/AlterationInspection Complete77,813 sq ft$800K est.- Project #
- TABS2026011591
- Tenant / owner
- Made In America Manufacturing
- Design firm
- Pro
- Contact
- Pro
Installation of irrigation
Installation of irrigation
City of Austin permitPlumbing PermitExpired- Record
- 2024-161521 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Adding 200 amp service warehouse general lighting and office finish out
Adding 200 amp service warehouse general lighting and office finish out
City of Austin permitElectrical PermitFinal- Record
- 2024-157548 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New irrigation system
New irrigation system
City of Austin permitPlumbing PermitExpired- Record
- 2024-045358 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical service meter installation for new construction of commercial building in etj 80077 sq ft ct inspection required
Electrical service meter installation for new construction of commercial building in etj 80077 sq ft ct inspection required
City of Austin permitElectrical PermitFinal- Record
- 2024-039672 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction in the etj tilt wall shell warehouse building 80000 sq ft
New construction in the etj tilt wall shell warehouse building 80000 sq ft
City of Austin permitPlumbing PermitFinal- Record
- 2023-160341 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 6633 Moores Crossing Blvd
What is being built at 6633 Moores Crossing Blvd?
Made In America Manufacturing is fitting out tenant office space in a previously permitted office/warehouse, identified as ATX 130 building 2. The TDLR project registration lists 77,813 square feet.
Is Made In America Manufacturing opening at 6633 Moores Crossing Blvd?
Records show a tenant office build-out for Made In America Manufacturing. They do not state an opening date.
When was the project at 6633 Moores Crossing Blvd filed?
The TDLR registration, TABS2026011591, is dated February 3, 2026. A City of Austin electrical permit, 2026-039696 EP, followed on May 7, 2026.
How large is the office build-out at 6633 Moores Crossing Blvd?
The TDLR registration lists the project at 77,813 square feet.
How much will the project at 6633 Moores Crossing Blvd cost?
The TDLR registration lists an estimated project cost of $800,000. This is the applicant's estimate, not a confirmed final cost.
What electrical work is planned at 6633 Moores Crossing Blvd?
A May 7, 2026, City of Austin permit covers new warehouse service with a 1,600-amp meter can. The permit status is Final.
Is the office build-out at 6633 Moores Crossing Blvd complete?
The TDLR registration status is Inspection Complete. The separate warehouse electrical permit is marked Final.
Also being built nearby
All of 78617- 6801-1/2 Elroy RdDec 17, 2022Atx 130 · 106 m away
- 6807-7/8 Elroy RdMay 28, 2026Atx 130 · 171 m away
- 6807 Elroy RdDec 30, 2024Install irrigation (etj) · 175 m away
- 11409 Tickford DrMay 29, 2026***lily reyes: replace existing 40-gal gas water heater with interior tankless gas water heater; no structural change · 198 m away
- 6405 Moores Crossing BlvdJul 23, 2024Tenant finish out in the etj restrooms/breakroom 120361 sq ft · 270 m away
- 11400 Cozette DrFeb 3, 2009Stoney ridge sec 2, amended plat of lots 9 & 10, block c, phase a — stoney ridge sec 2, amended plat of lots 9 & 10, block c, phase a · 374 m away
- 11609 Gemmer StJan 12, 2024Repair wiring per ae resecure meter socket to wall/home · 406 m away
- 7004 Hewers DrMar 22, 2024Ev charger install · 416 m away
- 11621 Gemmer StMar 27, 2026Express: repairs due to fire damage. interiors finish out drywall/cabinets/floors revision-plumbing work (gas test) · 444 m away
- 7008 Hewers DrOct 23, 2026Service upgrade from 100 amps to 200 amps · 463 m away
- 11624 Railton DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 473 m away
- 7010 Hewers DrFeb 3, 2026Main breaker is only pushing out 120v instead of 240v so im upgrading the 100a service to a 200a service instead of only replacing the faulty main breaker · 479 m away