Two EV-charging outlets permitted at 12704 Mundomar Dr

An electrical permit covers adding two 60-amp outlets for EV charging at the residence at 12704 Mundomar Dr. The City of Austin issued the active permit on April 8, 2026; a transfer switch will allow only one outlet to receive power at a time.

Summarized from City of Austin records · updated Apr 8, 2026

Projects
1
1 filings
Latest filing
Apr 8, 2026
since Apr 8, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

I would like to add 2 60 amp outlets for ev charging (nema 14-60r). the 2 outlets will be on the same circuit (60 amp dual pole breaker). however i will install a double throw power transfer switch to only allow one outlet to receive power at any time (i would like an outside outlet and an inside one for flexibility for ev charging). will be using awg4 thww-2 wires in an approved 1 to 1 1/4 electrical conduit

  1. AppliedApr 8, 2026
  2. IssuedApr 8, 2026
  3. WorkApr '26 – Mar '27
  4. Final inspection
65% through of the permit windowApr 8, 2026 → Mar 20, 2027

Permit & project history

1 project
  1. I would like to add 2 60 amp outlets for ev charging (nema 14-60r). the 2 outlets will be on the same circuit (60 amp dual pole breaker). however i will install a double throw power transfer switch to only allow one outlet to receive power at any time (i would like an outside outlet and an inside one for flexibility for ev charging). will be using awg4 thww-2 wires in an approved 1 to 1 1/4 electrical conduit

    I would like to add 2 60 amp outlets for ev charging (nema 14-60r). the 2 outlets will be on the same circuit (60 amp dual pole breaker). however i will install a double throw power transfer switch to only allow one outlet to receive power at any time (i would like an outside outlet and an inside one for flexibility for ev charging). will be using awg4 thww-2 wires in an approved 1 to 1 1/4 electrical conduit

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12704 Mundomar Dr

What is being built at 12704 Mundomar Dr?

A City of Austin electrical permit covers two 60-amp outlets for EV charging, one outside and one inside. The outlets will be configured so only one can receive power at a time.

When was the EV outlet permit issued at 12704 Mundomar Dr?

The City of Austin issued active permit 2026-042375 EP on April 8, 2026.

How many EV charging outlets are planned at 12704 Mundomar Dr?

The permit describes two 60-amp outlets: one outside and one inside. A transfer switch will allow only one outlet to receive power at a time.

Is a new EV charging station opening at 12704 Mundomar Dr?

The permit is for adding two outlets for EV charging at a residence, not for opening a public charging station. It was issued by the City of Austin on April 8, 2026.

What does Austin permit 2026-042375 EP cover?

The permit covers adding two 60-amp outlets for EV charging on the same circuit, with a double-throw transfer switch to power one outlet at a time. It was issued April 8, 2026.