13020 Orihuela Dr
Austin, TX 78652
Level 2 EV charger permitted at 13020 Orihuela Dr
A Level 2 electric vehicle charger was permitted for installation at 13020 Orihuela Dr in Austin on July 29, 2026. The City of Austin electrical permit, 2026-096558 EP, is listed as final.
Summarized from City of Austin records · updated Jul 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2026
- since Jul 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJul 27, 2026
- IssuedJul 29, 2026
- WorkJul '26 – Jan '27
- Final inspectionAug 4, 2026
Passed final inspection Aug 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-096558 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13020 Orihuela Dr
What is being installed at 13020 Orihuela Dr?
A City of Austin permit records installation of a Level 2 EV charger at the address.
When was the EV charger permit filed?
The electrical permit was filed on July 29, 2026.
What is the permit number for 13020 Orihuela Dr?
The permit number is 2026-096558 EP. The City of Austin lists it as final.
Is 13020 Orihuela Dr getting a Level 2 charger?
Yes. The permit description is “Install level 2 ev charger,” and the permit status is final.
Is a new building being constructed at 13020 Orihuela Dr?
The record provided is for an electrical permit to install a Level 2 EV charger; it does not list a new building project.
Also being built nearby
All of 78652- 6713 Taomina DrAug 18, 2026Total demolition of pool 546 sq ft · 87 m away
- 13401 Escarpment BlvdNov 10, 2026Eplan: commercial expedited review - new construction of community hall building (1549 sq ft) · 159 m away
- 12904 Orihuela DrJul 24, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw · 164 m away
- 6638-1/2 Bernia DrJan 21, 2022Avana phase one section six construction plans · 186 m away
- 6720 Denia DrSep 18, 2026New inground pool/spa · 187 m away
- 13009 Gandia DrAug 11, 2025Repipe upstairs bathroom in pex with angle stops and fittings · 194 m away
- 6724 Kalahari DrJul 2, 2026Install level 2 ev charger · 221 m away
- 12913 Gandia DrSep 5, 2024New pool with auto-fill and spa 406 sq ft pool spa is 56 sq ft · 249 m away
- 6409 Bernia DrAug 19, 2025Replacing the sump pump · 329 m away
- 6704 Vicenza DrJan 29, 2024Replace rpz · 369 m away
- 6333 Bernia DrFeb 6, 2025New above grade pool and spa with reqd enclosure device · 383 m away
- 12817 Cricoli DrAug 25, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas · 400 m away