groundranger
Recent · latest filing Apr 2026Residential

11417 Saddlebred Trl

Austin, TX 78653

Permit covers ESS and transfer switch installation

An electrical permit at 11417 Saddlebred Trl covers an ESS installation and a new 200-amp automatic transfer switch connected to the existing 200-amp panel. The City of Austin permit was filed April 6, 2026, and is marked final; it says no new meter can is required.

Summarized from City of Austin records · updated Apr 6, 2026

Projects
1
1 filings
Latest filing
Apr 6, 2026
since Apr 6, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ess installation. utility is bbec

  1. AppliedApr 2, 2026
  2. IssuedApr 6, 2026
  3. WorkApr '26 – May '26
  4. Final inspectionMay 5, 2026

Passed final inspection May 5, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ess installation. utility is bbec

    Request for disconnect for new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required. ess installation. utility is bbec

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11417 Saddlebred Trl

What is being installed at 11417 Saddlebred Trl?

A City of Austin electrical permit describes an ESS installation and a new 200-amp automatic transfer switch on the existing 200-amp panel.

When was the permit filed for 11417 Saddlebred Trl?

The permit was filed April 6, 2026.

What is the permit number for work at 11417 Saddlebred Trl?

The permit number is 2026-039945 EP. It is an electrical permit and is marked final.

Is a new electric meter being installed at 11417 Saddlebred Trl?

No. The permit description says a new meter can is not required.

Is the transfer switch connected to a new electrical panel?

The permit describes a new 200-amp automatic transfer switch on the existing 200-amp panel.

Email me when a new permit is filed