9809 Chirpy Way

Austin, TX 78653

9809 Chirpy Way: 1 project on record

City of Austin lists 1 filing across 1 project at 9809 Chirpy Way, Austin, TX 78653. The most recent, filed July 23, 2025, covers: “Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system”.

Compiled from City of Austin records · updated Jul 23, 2025

Projects
1
1 filings
Latest filing
Jul 23, 2025
since Jul 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system

  1. AppliedJul 9, 2025
  2. IssuedJul 23, 2025
  3. WorkJul '25 – Sep '25
  4. Final inspectionSep 5, 2025

Passed final inspection Sep 5, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system

    Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9809 Chirpy Way

What is being built at 9809 Chirpy Way?

The latest filing (City of Austin permit 2025-085222 PP, July 23, 2025) covers slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system.

How many permits and filings does 9809 Chirpy Way have?

1 filing across 1 project, from July 23, 2025 to July 23, 2025.

Is there other construction near 9809 Chirpy Way?

Yes. Nearby filings include 16532 Fetching Ave (124 tunnel below the foundation to replace entire pvc drain system. 3 access holes - right front left, Sep 9, 2026); 16528 Summery St (adding 2 double-gang outlets along one wall. i will be tying into an existing outlet opening the drywall to run the line through the studs to their locations under 10 feet away. the circuit will be gfci protected, Oct 16, 2024); 16417 Sumptuous Dr (utility: bbec. solar and battery installation. will need a temporary electric shutdown for electrical repairs, Nov 1, 2024).

How do I get alerts for new permits at 9809 Chirpy Way?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78653
Email me when a new permit is filed