groundranger
Active · latest filing Sep 2026Residential

1904 Spinel Rd

Austin, TX 78660

Electrical upgrades and backup battery permitted at 1904 Spinel Rd

Electrical permits at 1904 Spinel Rd cover a rebuilt main electrical service and a backup battery system with an additional meter socket. The service work was permitted July 24, 2026, and the battery system permit was filed September 29, 2026; both permits are listed as final.

Summarized from City of Austin records · updated Sep 29, 2026

Projects
2
2 filings
Latest filing
Sep 29, 2026
since Jul 24, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 15, 2026
  2. IssuedSep 29, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 22, 2026

Passed final inspection Oct 22, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Rebuild main service new riser meter can panel grounding surge protection austin energy scheduled shutdown required

    Rebuild main service new riser meter can panel grounding surge protection austin energy scheduled shutdown required

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1904 Spinel Rd

What is being built at 1904 Spinel Rd in Austin?

City of Austin permits indicate electrical work: a rebuilt main service and installation of a backup battery system with an additional meter socket. The records do not describe a new building.

Is a backup battery being installed at 1904 Spinel Rd?

A September 29, 2026, City of Austin electrical permit describes installation of a backup battery system and an additional meter socket. The permit, 2026-121287 EP, is listed as final.

What electrical work was permitted at 1904 Spinel Rd?

The permits cover a main service rebuild, including a new riser, meter can, panel, grounding and surge protection, as well as a backup battery system and additional meter socket.

When were the electrical permits filed for 1904 Spinel Rd?

The main service rebuild permit, 2026-094645 EP, was filed July 24, 2026. The backup battery permit, 2026-121287 EP, was filed September 29, 2026.

Are the permits for 1904 Spinel Rd final?

Both City of Austin electrical permits are listed as final: 2026-094645 EP and 2026-121287 EP.

Is a new home being built at 1904 Spinel Rd?

The available records describe electrical upgrades, not construction of a new home. They cover a main service rebuild and a backup battery system.

Also being built nearby

All of 78660
Email me when a new permit is filed