3500 Firoj Dr
Austin, TX 78660
3500 Firoj Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3500 Firoj Dr, Austin, TX 78660. The most recent, filed January 15, 2025, covers: “18ft sewer line repair”.
Compiled from City of Austin records · updated Jan 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 15, 2025
- since Jan 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled18ft sewer line repair
- AppliedDec 23, 2024
- IssuedJan 15, 2025
- WorkJan '25 – Mar '25
- Final inspectionMar 24, 2025
Passed final inspection Mar 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project18ft sewer line repair
18ft sewer line repair
City of Austin permitPlumbing PermitFinal- Record
- 2024-166413 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3500 Firoj Dr
What is being built at 3500 Firoj Dr?
The latest filing (City of Austin permit 2024-166413 PP, January 15, 2025) covers 18ft sewer line repair.
How many permits and filings does 3500 Firoj Dr have?
1 filing across 1 project, from January 15, 2025 to January 15, 2025.
Is there other construction near 3500 Firoj Dr?
Yes. Nearby filings include 3504 Firoj Dr (35ft water yard line repair to the manifold in the garage prv, Aug 20, 2025); 3512 Firoj Dr (replacement of complete existing central heat and air system with or without duct work, May 24, 2024); 3513 Firoj Dr (prv electric water heater changeout, Sep 23, 2024).
How do I get alerts for new permits at 3500 Firoj Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78660- 3504 Firoj DrAug 20, 202535ft water yard line repair to the manifold in the garage prv · 16 m away
- 3512 Firoj DrMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 3513 Firoj DrSep 23, 2024Prv electric water heater changeout · 53 m away
- 3408 Firoj DrJul 21, 2026Replacement of an existing water heater water heater tankless changeout · 53 m away
- 3409 Firoj DrJan 19, 202415 sewer tunnel · 65 m away
- 3420 Bach DrOct 26, 2026Repair the broken 3 pvc sewer line beneath the garage foundation by accessing the damaged area(2ftx2ft) replacing defective piping with schedule 40 pvc and testing the drain system for leaks · 83 m away
- 3401 Firoj DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 3516 Bach DrApr 18, 2025Express: replace 2 windows (like for like) · 96 m away
- 13301 Lismore LnSep 21, 2026Express: foundation repair (installing 13 hybrid steel piers 7 exterior breakouts 2 garage breakouts) · 120 m away
- 13212 Bryson DrJul 29, 2025Install level 2 ev charger · 132 m away
- 13309 Lismore LnOct 13, 2026Express: foundation repair - installing 14 steel hybrid piers and 6 exterior breakouts · 137 m away
- 13108 Cantarra DrFeb 4, 2025Express: foundation repair · 138 m away