904 Sally Lunn Way
Austin, TX 78660
904 Sally Lunn Way: 1 project on record
City of Austin lists 1 filing across 1 project at 904 Sally Lunn Way, Austin, TX 78660. The most recent, filed May 29, 2025, covers: “Replacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj”.
Compiled from City of Austin records · updated May 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 29, 2025
- since May 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj
- AppliedMay 27, 2025
- IssuedMay 29, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 4, 2025
Passed final inspection Jun 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj
Replacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj
City of Austin permitPlumbing PermitFinal- Record
- 2025-065345 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 904 Sally Lunn Way
What is being built at 904 Sally Lunn Way?
The latest filing (City of Austin permit 2025-065345 PP, May 29, 2025) covers replacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj.
How many permits and filings does 904 Sally Lunn Way have?
1 filing across 1 project, from May 29, 2025 to May 29, 2025.
What is being built near Northtown Municipal Utility District in Austin?
904 Sally Lunn Way is about 313 m from Northtown Municipal Utility District (700 E Wells Branch Parkway). Its latest filing is for replacement of an existing water heater 40h nat gas water heater replacement **austin 2 mile etj.
Is there other construction near 904 Sally Lunn Way?
Yes. Nearby filings include 14708 Earl Grey Ln (install new 5.220 kw rooftop solar system and 13.5 kw energy storage system for existing residential only, Nov 6, 2025); 14805 Earl Grey Ln (general work on existing solar system. no other work being performed, May 11, 2026); 15304 Hyson Xing (installation of a generator and automatic transfer switch with service upgrade, Jan 22, 2024).
How do I get alerts for new permits at 904 Sally Lunn Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78660- 14708 Earl Grey LnNov 6, 2025Install new 5.220 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 110 m away
- 14805 Earl Grey LnMay 11, 2026General work on existing solar system. no other work being performed · 163 m away
- 15304 Hyson XingJan 22, 2024Installation of a generator and automatic transfer switch with service upgrade · 260 m away
- 15024 Sassafras TrlSep 11, 2026Armstrong - 40-12388 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull · 294 m away
- 700 E Wells Branch Parkway · Northtown Municipal Utility DistrictOct 16, 2025Northtown m.u.d. trail gaps and miscellaneous park impro — renovation/alteration — concrete sidewalk replacement · 313 m away
- 700 Wells Branch PkwyDec 13, 2020Northtown municipal utility district administrative office and park · 363 m away
- 610 Wells Branch PkwyFeb 9, 2021Northtown · 389 m away
- 14701 John Henry Faulk DrAug 14, 2026Village at northtown condominiums (with r sp-2020-0212d) · 398 m away
- 14601 Harris Ridge BlvdMar 2, 2007Parkside at northtown · 422 m away
- 14701 Harris Ridge BlvdJun 8, 2012Village @ northtown sec 2 duplex phase 1 (withdrawl & resub of sp -2010-0174d) · 429 m away
- 14700-1/2 Harris Ridge BlvdNov 15, 2010Village at northtown, lot 6, block c, construction plans · 464 m away
- 14600 Harris Ridge BlvdMar 29, 2007Parkside at northtown-block f · 465 m away