1005 Congress Ave
Austin, TX 78701 · Congress Holdings Ltd
Lobby renovation registered at 1005 Congress Ave
A renovation of the existing lobby at 1005 Congress Ave includes new finishes, lighting and storefront work. The project was registered with TDLR on September 29, 2026; the applicant estimated its cost at $295,474.
Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Sep 29, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 29, 2026
- since Mar 31, 2025
- Largest scope
- 864 sf
- Estimated cost
- $295K
- state registration
Where this project stands
In state plan review1005 Congress Lobby Renovations
864 sq ft · $295K est.
- RegisteredSep 29, 2026
- Plan reviewnow
- ConstructionJun '27 – Dec '27
- Inspected
- Closed
Construction is scheduled to start Jun 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsRenovation of existing lobby including new finishes, lighting and storefront. — 1005 congress
TDLR project registrationRenovation/AlterationProject Registered864 sq ft$295K est.- Project #
- TABS2027002195
- Tenant / owner
- 1005 Congress Lobby Renovations
- Design firm
- Pro
- Contact
- Pro
Install access control: consists of lifesafety power enclosure with backup batteries controller signo keypad electrified mortise lock and other complementing system for suite 470
Install access control: consists of lifesafety power enclosure with backup batteries controller signo keypad electrified mortise lock and other complementing system for suite 470
City of Austin permitBuilding PermitFinal- Record
- 2025-035395 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Austin
Questions about 1005 Congress Ave
What is being built at 1005 Congress Ave?
The project is a renovation of the existing lobby, including new finishes, lighting and storefront work. TDLR registration TABS2027002195 was filed September 29, 2026.
When was the 1005 Congress lobby renovation permitted?
The lobby renovation was registered with TDLR on September 29, 2026. A separate City of Austin permit for access control in suite 470 was finalized March 31, 2025.
How much will the 1005 Congress lobby renovation cost?
The applicant estimated the project cost at $295,474 in its TDLR registration. This is an estimate, not a confirmed final cost.
Is a new restaurant opening at 1005 Congress Ave?
The available records describe a renovation of the existing lobby, including finishes, lighting and storefront work. They do not identify a restaurant.
What's being renovated near Brick & Timber Collective on Congress Ave?
A lobby renovation was registered at 1005 Congress Ave, about 2 meters from Brick & Timber Collective according to the nearby-landmark records. The work includes new finishes, lighting and storefront.
What access control work is happening at 1005 Congress Ave?
A City of Austin permit describes access-control installation in suite 470, including a life-safety power enclosure, controller, keypad and electrified mortise lock. Permit 2025-035395 BP was finalized March 31, 2025.
Also being built nearby
All of 78701- 1007 S. Congress Ave · Music Lane 1007 Owner LPSep 29, 2026Brick & timber collective — renovation/alteration — commercial tenant improvement on the 4th floor. including demolition and construction of non-structural partitions, ceilings, finishes and furniture/equipment and associated mep improvements. floor is demised for (2) new tenants · 2 m away
- 1001 Congress AveMar 13, 2026Recover with 115mil tpo fleeceback · 35 m away
- 916 Congress AveApr 11, 2025916 congress · 67 m away
- 907 Congress AveDec 14, 2023Partial demolition. and bracing with shoring plan (one wall will be kept for bracing) [15-25 day review] · 85 m away
- 920 Congress AveOct 12, 2026Swift house congress - blade sign · 95 m away
- 918 Congress Avenue · Swift Fit Venues LLCOct 7, 2026Swift house on congress — renovation/alteration — interior remodel of two bathrooms, adding access doors between buildings, and other aesthetic renovation · 97 m away
- 911 Congress AveDec 14, 2023Partial demolition. and bracing with shoring plan (one wall will be kept for bracing) [15-25 day review] · 104 m away
- 901 Congress AveAug 19, 2013Tppf · 105 m away
- 909 Congress AveDec 14, 2023Partial demolition. and bracing with shoring plan (one wall will be kept for bracing) [15-25 day review] · 106 m away
- 908 Congress AveFeb 16, 2026Replace tankless water heater · 106 m away
- 905 Congress AveFeb 19, 2026Restoration of interior finishes and millwork due to fire/water damage. include replacement of damaged roofing skylights and rooftop equipment · 110 m away
- 900 Congress AveNov 4, 2024Upgrade at&t communications equipment in an existing cell collocation rooftop · 114 m away