109 E 7th St
Austin, TX 78701
109 E 7th St: 1 project on record
City of Austin lists 1 filing across 1 project at 109 E 7th St, Austin, TX 78701. The most recent, filed April 12, 2024, covers: “Remove existing partition between two accessory use conference rooms and provide a new mobile partition”.
Compiled from City of Austin records · updated Apr 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 12, 2024
- since Apr 12, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemove existing partition between two accessory use conference rooms and provide a new mobile partition
Remove existing partition between two accessory use conference rooms and provide a new mobile partition
City of Austin permitBuilding PermitFinal- Record
- 2024-036698 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 109 E 7th St
What is being built at 109 E 7th St?
The latest filing (City of Austin permit 2024-036698 BP, April 12, 2024) covers remove existing partition between two accessory use conference rooms and provide a new mobile partition.
How many permits and filings does 109 E 7th St have?
1 filing across 1 project, from April 12, 2024 to April 12, 2024.
What is being built near Paramount Theatre in Austin?
109 E 7th St is about 50 m from Paramount Theatre (713 Congress Ave). Its latest filing is for remove existing partition between two accessory use conference rooms and provide a new mobile partition.
Is there other construction near 109 E 7th St?
Yes. Nearby filings include 701 Congress Ave (install 26 new doors with side-lites transoms and thresholds. paint railings for existing hotel, Feb 24, 2026); 709 Congress Ave (7 day repair and replace and deteriorated wood repaint. replace existing roof with new tpo roof. - ova, May 19, 2026); 713 Congress Ave (eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft), Sep 1, 2026).
How do I get alerts for new permits at 109 E 7th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78701- 701 Congress AveFeb 24, 2026Install 26 new doors with side-lites transoms and thresholds. paint railings for existing hotel · 43 m away
- 709 Congress AveMay 19, 20267 day repair and replace and deteriorated wood repaint. replace existing roof with new tpo roof. - ova · 47 m away
- 713 Congress Ave · Paramount TheatreSep 1, 2026Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft) · 50 m away
- 719 Congress Ave · State TheatreMar 3, 2025Exterior and complete interior renovation of the historic state theatre an existing multi-story concrete structure consists of abasement with 3 levels above grade including lobby mezzanine new rooftop lounge and 3 flrs of seating · 54 m away
- 700 Congress AveMar 2, 20262026/03/17 | storytelling event featuring global stories on womens health -hosted by gates foundation and the moth the event will be on march 17 2026 at the contemporary austin jones center moody rooftop. therell be a reception starting at 4pm. the show will be from 4:30-5:45pm. the post-show reception will be from 5:45-6:30pm. the event will feature 3 storytellers - with stories relating to womens health. the show will be opened by a musician playing a 2 minutes set. followed by a host taking us through the show. lastly we will most likely have a 15 mins q&a session after the show. #sxswaffiliated · 54 m away
- 710 Congress AveNov 25, 2024Install new exterior meter and interior main breaker rated rated at 20000 afc. reduce 1200 amp service to 800 amp service. new ships ladder to mech room. remove 3x3 elec. conduit & install 2x4 to manhole in alley · 59 m away
- 718 Congress AveAug 5, 2024Secondary mechanical contractor performing walk in cooler and refrigeration installation only reference 2023-008932 bp · 63 m away
- 722 Congress AveJan 8, 2024Removing modified bitumen roofing with.60 mil tpo of 24 sqs. no decking or penetrations. no structural changes · 66 m away
- 114 West 7th Street · Norwood TowerDec 30, 2025Norwood tower level 09 — renovation/alteration — alteration of interior space · 70 m away
- 106 E 6th StFeb 11, 2026General construction for pathc / repair structural to support equipment mechanical electrical and fire alarm drawings · 75 m away
- 617 Congress Ave · 617 Congress Holdings LLCAug 24, 2026Installation of fireline with riser · 79 m away
- 613 Congress AveOct 13, 2025Replace 1/2 backflow preventer located on wall behind slurpee / soda fountain machine · 82 m away