722 Congress Ave
Austin, TX 78701
Roof replacement permit filed for 722 Congress Ave
A City of Austin permit filed Jan. 8, 2024, describes replacing the modified bitumen roof at 722 Congress Ave with TPO roofing over 24 squares. The permit says there would be no decking, roof penetrations, or structural changes, and its status is expired.
Summarized from City of Austin records · updated Jan 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 8, 2024
- since Jan 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredRemoving modified bitumen roofing with.60 mil tpo of 24 sqs. no decking or penetrations. no structural changes
- AppliedDec 20, 2023
- IssuedJan 8, 2024
- !WorkJan '24 – Jan '25
- Final inspection
Marked expired Jan 4, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemoving modified bitumen roofing with.60 mil tpo of 24 sqs. no decking or penetrations. no structural changes
Removing modified bitumen roofing with.60 mil tpo of 24 sqs. no decking or penetrations. no structural changes
City of Austin permitBuilding PermitExpired- Record
- 2023-162828 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 722 Congress Ave
What is being built at 722 Congress Ave?
The permit describes a roof replacement, not a new building. It calls for removing modified bitumen roofing and installing TPO roofing.
When was the roof replacement permitted at 722 Congress Ave?
The City of Austin permit was filed Jan. 8, 2024. Its number is 2023-162828 BP.
Is the 722 Congress Ave permit still active?
No. The City of Austin record lists permit 2023-162828 BP as expired.
What work does permit 2023-162828 BP describe?
It describes removing modified bitumen roofing and installing TPO roofing over 24 squares. The record says there would be no decking, penetrations, or structural changes.
What's changing at 722 Congress Ave near the State Theatre?
The permit for 722 Congress Ave describes roof replacement. The State Theatre is listed 13 meters away at 719 Congress Ave.
Is a new building planned at 722 Congress Ave near the Paramount Theatre?
The record provided describes roof replacement, not construction of a new building. The Paramount Theatre is listed 16 meters away at 713 Congress Ave.
Also being built nearby
All of 78701- 718 Congress AveAug 5, 2024Secondary mechanical contractor performing walk in cooler and refrigeration installation only reference 2023-008932 bp · 4 m away
- 710 Congress AveNov 25, 2024Install new exterior meter and interior main breaker rated rated at 20000 afc. reduce 1200 amp service to 800 amp service. new ships ladder to mech room. remove 3x3 elec. conduit & install 2x4 to manhole in alley · 12 m away
- 719 Congress Ave · State TheatreMar 3, 2025Exterior and complete interior renovation of the historic state theatre an existing multi-story concrete structure consists of abasement with 3 levels above grade including lobby mezzanine new rooftop lounge and 3 flrs of seating · 13 m away
- 713 Congress Ave · Paramount TheatreSep 1, 2026Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft) · 16 m away
- 709 Congress AveMay 19, 20267 day repair and replace and deteriorated wood repaint. replace existing roof with new tpo roof. - ova · 19 m away
- 700 Congress AveMar 2, 20262026/03/17 | storytelling event featuring global stories on womens health -hosted by gates foundation and the moth the event will be on march 17 2026 at the contemporary austin jones center moody rooftop. therell be a reception starting at 4pm. the show will be from 4:30-5:45pm. the post-show reception will be from 5:45-6:30pm. the event will feature 3 storytellers - with stories relating to womens health. the show will be opened by a musician playing a 2 minutes set. followed by a host taking us through the show. lastly we will most likely have a 15 mins q&a session after the show. #sxswaffiliated · 22 m away
- 701 Congress AveFeb 24, 2026Install 26 new doors with side-lites transoms and thresholds. paint railings for existing hotel · 25 m away
- 114 W 7th StApr 1, 2026Partial renovation of existing interior space for suite 900 · 27 m away
- 114 West 7th Street · Norwood TowerDec 30, 2025Norwood tower level 09 — renovation/alteration — alteration of interior space · 27 m away
- 109 E 7th StApr 12, 2024Remove existing partition between two accessory use conference rooms and provide a new mobile partition · 66 m away
- 721 Congress AveFeb 25, 202527795 - hyatt centric - tradition illuminated sign · 79 m away
- 801 Congress AveJul 7, 2025Replacement of complete existing central heat and air system with or without duct work replace 10-ton condensing unit and air handler replace 15-ton condensing unit and air handler condensing units located on 4th-floor rooftop pad. crane lift required for removal and installation · 89 m away