713 Congress Ave
Austin, TX 78701 · Paramount Theatre
Paramount Theatre renovation planned at 713 Congress Ave
A partial renovation of the existing Paramount Theatre is planned at 713 Congress Ave. The project was registered with TDLR on May 11, 2026, and the City of Austin issued a building permit dated June 5 for an interior remodel. Related electrical, plumbing and mechanical permits were filed through September 1. TDLR lists an estimated project cost of $21.7 million.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Sep 1, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Sep 1, 2026
- since May 17, 2024
- Largest scope
- 10,000 sf
- Estimated cost
- $22M
- state registration
Where this project stands
Permit active · work underwayEplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
- AppliedApr 16, 2026
- IssuedSep 1, 2026
- WorkSep '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
6 projectsEplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
City of Austin permitMechanical PermitActive- Record
- 2026-067962 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
City of Austin permitPlumbing PermitActive- Record
- 2026-067962 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
City of Austin permitElectrical PermitActive- Record
- 2026-067962 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
Eplan: commercial expedited review - interior remodel to existing theater (26075 sq ft)
City of Austin permitBuilding PermitActive- Record
- 2026-067962 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
This project includes a partial renovation of the existing paramount theatre. this project will be filed under the work area compliance method of the 2024 austin existing building code (2024 aebc 303.1, chapters 6-12). — paramount theatre
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$22M est.- Project #
- TABS2026019952
- Tenant / owner
- Paramount Theatre Restoration
- Design firm
- Pro
- Contact
- Pro
Repair 11 lf of sidewalk in row.*shay minimum 5 wide pedestrian access to remain closest to street
Repair 11 lf of sidewalk in row.*shay minimum 5 wide pedestrian access to remain closest to street
City of Austin permitDriveway / SidewalksExpired- Record
- 2024-047821 DS
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 713 Congress Ave
What is being built at 713 Congress Ave in Austin?
Records indicate a partial renovation and interior remodel of the existing Paramount Theatre, not a new building. The TDLR registration was filed May 11, 2026.
Is the Paramount Theatre in Austin being renovated?
Yes. The TDLR project registration describes a partial renovation, and City of Austin permit 2026-067962 BP, dated June 5, 2026, describes an interior remodel of the existing theater.
When were permits filed for the Paramount Theatre renovation?
The project was registered with TDLR on May 11, 2026. City permits followed: building on June 5, electrical on July 6, plumbing on August 24 and mechanical on September 1.
How much will the Paramount Theatre renovation cost?
The TDLR registration lists an estimated project cost of $21.7 million. This is the applicant's estimate for the project.
Are the Paramount Theatre renovation permits active?
The City of Austin building, electrical, plumbing and mechanical permits in the records are listed as active. The TDLR project registration is marked Review Complete.
What's being renovated near Norwood Tower in downtown Austin?
A partial renovation of the existing Paramount Theatre at 713 Congress Ave is registered in public records. Norwood Tower is listed about 32 meters away.
Also being built nearby
All of 78701- 709 Congress AveMay 19, 20267 day repair and replace and deteriorated wood repaint. replace existing roof with new tpo roof. - ova · 4 m away
- 719 Congress Ave · State TheatreMar 3, 2025Exterior and complete interior renovation of the historic state theatre an existing multi-story concrete structure consists of abasement with 3 levels above grade including lobby mezzanine new rooftop lounge and 3 flrs of seating · 6 m away
- 701 Congress AveFeb 24, 2026Install 26 new doors with side-lites transoms and thresholds. paint railings for existing hotel · 12 m away
- 710 Congress AveNov 25, 2024Install new exterior meter and interior main breaker rated rated at 20000 afc. reduce 1200 amp service to 800 amp service. new ships ladder to mech room. remove 3x3 elec. conduit & install 2x4 to manhole in alley · 13 m away
- 718 Congress AveAug 5, 2024Secondary mechanical contractor performing walk in cooler and refrigeration installation only reference 2023-008932 bp · 14 m away
- 722 Congress AveJan 8, 2024Removing modified bitumen roofing with.60 mil tpo of 24 sqs. no decking or penetrations. no structural changes · 16 m away
- 700 Congress AveMar 2, 20262026/03/17 | storytelling event featuring global stories on womens health -hosted by gates foundation and the moth the event will be on march 17 2026 at the contemporary austin jones center moody rooftop. therell be a reception starting at 4pm. the show will be from 4:30-5:45pm. the post-show reception will be from 5:45-6:30pm. the event will feature 3 storytellers - with stories relating to womens health. the show will be opened by a musician playing a 2 minutes set. followed by a host taking us through the show. lastly we will most likely have a 15 mins q&a session after the show. #sxswaffiliated · 17 m away
- 114 W 7th StApr 1, 2026Partial renovation of existing interior space for suite 900 · 32 m away
- 114 West 7th Street · Norwood TowerDec 30, 2025Norwood tower level 09 — renovation/alteration — alteration of interior space · 32 m away
- 109 E 7th StApr 12, 2024Remove existing partition between two accessory use conference rooms and provide a new mobile partition · 50 m away
- 721 Congress AveFeb 25, 202527795 - hyatt centric - tradition illuminated sign · 82 m away
- 801 Congress AveJul 7, 2025Replacement of complete existing central heat and air system with or without duct work replace 10-ton condensing unit and air handler replace 15-ton condensing unit and air handler condensing units located on 4th-floor rooftop pad. crane lift required for removal and installation · 98 m away