1300 Red River Street
Austin, TX 78701 · Innovation Center, Texas Permanent School Fund
Office build-outs registered at 1300 Red River Street
TDLR registrations show interior office build-outs in the multi-tenant Innovation Tower at 1300 Red River Street. The Innovation Center project, an approximately 26,076-square-foot build-out, was registered on March 27, 2024; a separate Texas Permanent School Fund office build-out was registered on November 30, 2023.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Mar 27, 2024
- since Mar 27, 2024
- Largest scope
- 26,076 sf
- Estimated cost
- $9.0M
- state registration
Where this project stands
CompletedInnovation Center
26,076 sq ft · $5.0M est.
- RegisteredMar 27, 2024
- Plan review
- ConstructionMay '24 – Dec '24
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projects1st generation interior build out of approximately 26,076 sq ft — innovation tower
TDLR project registrationRenovation/AlterationProject Closed26,076 sq ft$5.0M est.- Project #
- TABS2024014820
- Tenant / owner
- Innovation Center
- Design firm
- Pro
- Contact
- Pro
Interior build-out of office space on two floors including new interconnecting stair; includes all necessary mechanical, electrical and plumbing. — innovation tower
TDLR project registrationNew ConstructionProject Closed43,963 sq ft$9.0M est.- Project #
- TABS2024006384
- Tenant / owner
- Texas Permanent School Fund
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1300 Red River Street
What is being built at 1300 Red River Street?
TDLR records show interior office build-outs in the multi-tenant Innovation Tower, including projects listed as Innovation Center and Texas Permanent School Fund. The Innovation Center registration describes about 26,076 square feet of work.
When was the Innovation Center project at 1300 Red River permitted?
The TDLR registration for the approximately 26,076-square-foot Innovation Center build-out is dated March 27, 2024. Its project number is TABS2024014820.
What work was registered for the Texas Permanent School Fund at 1300 Red River?
A November 30, 2023 TDLR registration describes an office build-out on two floors, including a new interconnecting stair and mechanical, electrical, and plumbing work. The project is listed at 43,963 square feet.
Is 1300 Red River Street a single-tenant building?
The records identify the address as a multi-tenant building and list separate Innovation Center and Texas Permanent School Fund projects. They do not attribute the entire address to either one.
How much will the work at 1300 Red River Street cost?
The TDLR applicant estimate for the Texas Permanent School Fund project is $9,032,571. A separate $5 million figure is reported for the Innovation Center registration and should not be treated as the total cost for the address.
What is happening at 1300 Red River near the City of Austin?
TDLR records show interior office build-outs in the multi-tenant Innovation Tower at 1300 Red River Street, near the City of Austin building at 1305 Red River Street. The Innovation Center registration is dated March 27, 2024.
Are the 1300 Red River Street projects still underway?
Both TDLR project registrations are listed as closed. The Innovation Center registration is dated March 27, 2024, and the Texas Permanent School Fund registration is dated November 30, 2023.
Also being built nearby
All of 78701- 1300 Red River St · The 2033 Higher Education Development FoundationSep 10, 2026Tenant finish out -divide floor 10 into 7 spec suites · 11 m away
- 1305 Red River Street · City Of AustinOct 21, 2025Ems medic 3 renovation — renovation/alteration — deferred maintenance improvements to existing ems station · 18 m away
- 1225 Red River StMar 2, 2007Rehabilitation hospital · 32 m away
- 1313 Red River St · The 2033 Higher Education DevelopmentJun 25, 2024Sante ventures — new construction — partial office interior finish out and common corridor on level 15 of level 16 office building · 42 m away
- 1400 Red River StSep 17, 2026Interior renovation of an existing ems station this project includes deferred maintenance in order to bring the station closer to alignment with the current departmental standards · 53 m away
- 1313-1/2 Red River StApr 15, 2024Block 164 public infrastructure plans · 64 m away
- 500 E 12th StApr 7, 20262026/04/14 | meet us at waterloo park on april 18 spread out your blanket and enjoy incredible food music and sunset views with thousands of austinites supporting the same vision a boundless public park system in the heart of downtown austin. we will host our annual picnic on the great lawn at moody amphitheater where you and your friends and family can enjoy a variety of delicious picnic baskets prepared by some of austins finest restaurants · 95 m away
- 1201 Red River StMar 11, 2025Waterloo park tower (with r sp-2014-0484c) · 105 m away
- 1215 Red River StJan 16, 2024Cap off of water & wastewater for demolition of a four story 88.400 square foot rehabilitation hospital da-2023-0009 -approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 109 m away
- 608 E 12th StJan 18, 2024Demolition of a 13500 square foot parking garage da-2023-0010 - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 137 m away
- 1128 Red River StMar 2, 2007Waller creek wall repair · 146 m away
- 1213 Sabine StNov 4, 2024Interior remodel adding two restrooms with showers revising wall placements and associated ceiling grids & mechanical ducts · 165 m away