227 Congress Ave
Austin, TX 78701
Expired permit for a non-structural roof replacement
A City of Austin permit filed December 8, 2023, describes a non-structural re-roof of the existing commercial building at 227 Congress Ave. The permit, 2019-205717 BP, is listed as expired.
Summarized from City of Austin records · updated Dec 8, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2023
- since Dec 8, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNon-structural re-roof to existing commercial building
- AppliedOct 11, 2019
- IssuedDec 8, 2023
- !WorkDec '23 – Jun '24
- Final inspection
Marked expired Jun 6, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectNon-structural re-roof to existing commercial building
Non-structural re-roof to existing commercial building
City of Austin permitBuilding PermitExpired- Record
- 2019-205717 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 227 Congress Ave
What is being built at 227 Congress Ave?
A City of Austin permit describes a non-structural re-roof of the existing commercial building. The permit is listed as expired.
Is a new building going up at 227 Congress Ave?
The record is for roof work on an existing commercial building, not a new building.
What is the status of the 227 Congress Ave permit?
Permit 2019-205717 BP is listed as expired.
When was the roof permit filed for 227 Congress Ave?
The City of Austin permit was filed on December 8, 2023.
What kind of roof work was permitted at 227 Congress Ave?
The permit description says non-structural re-roofing of the existing commercial building.
Is 227 Congress Ave near the JW Marriott?
Yes. The JW Marriott at 110 E 2nd Street is listed about 28 meters from 227 Congress Ave.
Also being built nearby
All of 78701- 214 Congress AveMar 4, 20262026/03/13 - 2026/03/16 | (2026/03/02 - 2026/03/17) | 4 day public event featuring keynotes live music and other activations #sxswaffiliated · 17 m away
- 110 E 2nd Street · Jw MarriottMar 24, 2025Lobby & dining renovation - jw marriott — renovation/alteration — first floor renovation of select areas of an existing hotel, including lobby, bar, and restaurant spaces · 28 m away
- 211-1/2 Congress AveMay 23, 2012Block 18 alley wastewater relocation · 32 m away
- 200 Congress AveNov 2, 2026Lce 46 — renovation/alteration — new led lighting tracks, new linear diffusors for hvac supply/returns, wood wall and ceiling paneling, door replacements · 34 m away
- 217 Congress AveFeb 12, 2025Sxsw music event using a 16x12x18 biljax stage with 9-15 occupants · 54 m away
- 110 E 2nd StMay 28, 2025Eplan: commercial expedited review - interior remodel to existing hotel. work to include remodel market and corridor fireplace and lounge bar lobby and reception - phase b1 b2 and b3 (11965 sq ft) · 64 m away
- 301 Congress Ave, Level 8 · Pr 301 Congress LPSep 18, 2026301 congress level 8 certinia — renovation/alteration — interior renovation of existing conditions on level 8, including construction of ceilings, walls, finishes, and associated mep improvements · 84 m away
- 301 Congress Ave · Pr 301 Congress LPNov 9, 2026Interior non structural demolition · 84 m away
- 301 Congress Avenue · Pr 301 Congress LPSep 11, 2024301 congress spec suite 1370 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitons, ceilings, finishes, equipment and associated mep improvements · 84 m away
- 301 Congress Level 7 · Pr 301 Congress LPFeb 10, 2026Ninjaone gender neutral restrooms — renovation/alteration — addition of gender neutral restrooms to existing suite on levels 5 and 7 · 84 m away
- 301 Congress, Level 18 · Pr 301 Congress LPAug 13, 2026Level 18 corridor and restroom remodel — renovation/alteration — interior renovation of existing restroom, multi-tenant corridor, and elevator lobby · 84 m away
- 301 Congress · Pr 301 Congress LPAug 28, 2025301 congress spec suite 1300 — renovation/alteration — spec suite buildout on floor 13, including demolition and construction of non-structural partitions, ceilings, finishes, equipment and associated mep improvements · 84 m away