300 W. 6th St. Suites 900, 1000, 1100
Austin, TX 78701 · 300 W 6th Street
Interior stair removal and slab infill at 300 W. 6th
Meta Restoration Phase II is a 1,415-square-foot renovation at 300 W. 6th St. in Austin, involving removal of an interior non-fire stair and slab infill. The project was registered with TDLR on January 20, 2026; the applicant’s estimated project cost is $2.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 20, 2026
- since Jan 20, 2026
- Largest scope
- 1,415 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
Finishing up · inspection nextMeta Restoration Phase II
1,415 sq ft · $2.5M est.
- RegisteredJan 20, 2026
- Plan review
- ConstructionMar '26 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemoval of interior non-fire stair and slab infill — 300 w 6th street
TDLR project registrationRenovation/AlterationReview Complete1,415 sq ft$2.5M est.- Project #
- TABS2026010440
- Tenant / owner
- Meta Restoration Phase II
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 300 W. 6th St. Suites 900, 1000, 1100
What is being built at 300 W. 6th St. in Austin?
TDLR records describe Meta Restoration Phase II, a renovation involving removal of an interior non-fire stair and slab infill. The registration lists 1,415 square feet of work.
Is Meta Restoration Phase II a new building?
No new building is listed in the TDLR registration. The project is classified as a renovation or alteration at 300 W. 6th St.
What work is planned at 300 W. 6th St.?
The registered scope calls for removal of an interior non-fire stair and slab infill. The project is listed as Meta Restoration Phase II.
When was the 300 W. 6th St. project filed?
Meta Restoration Phase II was registered with TDLR on January 20, 2026. Its project number is TABS2026010440.
How much will the Meta Restoration Phase II project cost?
The applicant estimated the project cost at $2.5 million. TDLR records list the work area as 1,415 square feet.
What’s happening near Meta Restoration on West 6th Street?
Meta Restoration Phase II is registered at 300 W. 6th St., the same address as the nearby Meta Restoration listing. Its scope is removal of an interior non-fire stair and slab infill.
Also being built nearby
All of 78701- 300 W 6th St · 300 West SixthOct 28, 2026Interior alteration of approximately 3552 sq ft of existing office space-unit 1510
- 300 W 6th Street · Cshv-300 West 6th Street, LLCSep 7, 2026Savills office expansion — renovation/alteration — interior renovation of existing office and bream room on level 15
- 300 W 6th St., Suites 900, 1000, 1100, 1200, 1300, 1400 · 300 W 6th StreetDec 23, 2025Meta restoration — renovation/alteration — interior alteration of an existing office space
- 305 W 6th StMar 4, 20252025/03/07 thru 2025/03/15 *a-2 assembly needing building permit for tent. normal events we host here all year long panels and discussions live music on our stages. bar and food service. music artists are local djs singer songwriter indie folk and pop. no national artists · 13 m away
- 321 W 6th StJun 19, 2025New construction of a 698 square foot swimming pool for existing multi-family · 23 m away
- 321 W. 6th Street · 321 W 6th Street Owner, LLCSep 30, 202617th floor spec suites — renovation/alteration — 16,500 sq ft interior finish-out of shell space to create 3 spec suites, common training room with storage & cafe, and mulit-tenant corridor · 23 m away
- 321 W. Sixth Street · 321 W. Sixth StreetMar 27, 2024Studio by tishman speyer — new construction — a full floor tenant finish out of a first generation space · 23 m away
- 321 West 6th Street · 321 W. 6th Street Owner, L.l.c.May 2, 2024Pnc tx austin downtown ti — renovation/alteration — interior build-out on the 1st floor of an existing high-rise building.exterior work is limited to installation of new signage and after hours deposit box · 23 m away
- 323 W 6th StMar 26, 2026New finish out of existing restaurant shell for coffee shop. existing accessible bathroom with diaper changing station by base building approved under separate permit to remain not in scope · 25 m away
- 323 West 6th Street · Atx TowerAug 14, 2025Black fox coffee — renovation/alteration — interior alterations of existing restaurant shell to new restaurant; 930sqft · 25 m away
- 325 W 6th Street · Atx TowerJun 19, 2025Pnc tx austin mb 12th and 14th floor build out — renovation/alteration — the scope of the project includes a 17,180 sq ft first generation buildout of the 20,230 sq ft 12th and 14th floor space of an existing 55 floor building. this includes but is not limited to new walls, door, ceilings, casework, lighting and mep systems · 26 m away
- 327 W 6th StFeb 23, 20261st generation interior build-out on the 1st floor of an existing high-rise building. exterior work is limited to installation of new signage and after hours deposit box · 28 m away