500 E Cesar Chavez St
Austin, TX 78701
Austin Convention Center demolition and remodel permits
City of Austin records show a permit for total demolition of the 881,400-square-foot Austin Convention Center, filed April 17, 2025. Permits filed in April 2026 describe underground work for a remodel of the existing convention center; they do not specify a new building or its use.
Summarized from City of Austin records · updated Apr 6, 2026
- Projects
- 10
- 10 filings
- Latest filing
- Apr 6, 2026
- since Dec 6, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
10 projectsEplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
Eplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
City of Austin permitElectrical PermitActive- Record
- 2026-038215 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
Eplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
City of Austin permitPlumbing PermitActive- Record
- 2026-038215 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
Eplan: commercial expedited review - [public project] interior remodel to existing convention center - underground work only. (excludes 1 story above grade structure on ne block refer to 2025 069720bp) (1468254 sq ft)
City of Austin permitBuilding PermitActive- Record
- 2026-038215 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - [approved ] [public project] remodel to existing convention center (9806 sq ft)
Eplan: commercial expedited review - [approved ] [public project] remodel to existing convention center (9806 sq ft)
City of Austin permitBuilding PermitExpired- Record
- 2025-069720 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Cap off with ww
Cap off with ww
City of Austin permitPlumbing PermitFinal- Record
- 2025-054105 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of 881400 sq ft austin convention center circa 1992. the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Total demolition of 881400 sq ft austin convention center circa 1992. the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2025-045449 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
City of Austin permitElectrical PermitFinal- Record
- 2023-154194 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
City of Austin permitMechanical PermitFinal- Record
- 2023-154194 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
Project is to remove & replace the decommissioned existing boilers on both the north & south sides of the austin convention center
City of Austin permitBuilding PermitFinal- Record
- 2023-154194 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Maintenance replacement of broken overhead coiling fire door
Maintenance replacement of broken overhead coiling fire door
City of Austin permitElectrical PermitFinal- Record
- 2022-038469 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 500 E Cesar Chavez St
What is being built at 500 E Cesar Chavez St?
The permits describe demolition of the Austin Convention Center and remodel work to the existing convention center, including underground work. They do not specify a new building.
When were permits filed for 500 E Cesar Chavez St?
The demolition permit was filed April 17, 2025. The latest listed permits for underground remodel work were filed April 1 and April 6, 2026.
Is the Austin Convention Center being demolished?
A City of Austin permit filed April 17, 2025, describes total demolition of the 881,400-square-foot convention center and has a final status in the record.
What does the 2026 permit cover at the convention center?
Permits 2026-038215 BP, EP and PP describe an interior remodel to the existing convention center, limited to underground work. The building permit is dated April 1, 2026; the electrical and plumbing permits are dated April 6, 2026.
What's being built near Waterline Solar Canopy?
At 500 E Cesar Chavez St, permits describe demolition of the existing convention center and underground work for a remodel. The nearby Waterline Solar Canopy is listed separately at 503 E Cesar Chavez.
Also being built nearby
All of 78701- 503-1/2 Cesar Chavez StMar 2, 2016Waller park place trail improvements · 38 m away
- 503 E Cesar Chavez StAug 21, 2026New solar canopy sp-2013-0449c - approved · 44 m away
- 503 E Cesar Chavez · Waller Creek Owner LLCAug 6, 2026Waterline solar canopy — new construction — steel supported solar canopy and surrounds. roof of canopy is solar panels with translucent blanks. structure is steel framed construction. canopy is for public and will have moveable furniture underneath. no storage · 53 m away
- 98 Red River StJul 20, 2026Waller park place · 79 m away
- 120-1/2 Red River StMar 17, 2016Canopy walk · 80 m away
- 101 Red River StNov 28, 2023Fairmont manchester - wall sign (lit) · 103 m away
- 97-1/2 Red River StApr 2, 2024Austin loop transportation system · 117 m away
- 96 Red River StMar 16, 2026*fka 92 red river st* eplan: expedited review - first time finish out for hotel kitchen flr 14 (968 sq ft) · 117 m away
- 99 Trinity StDec 18, 201599 trinity tower (withdraw & resubmittal of sp-2013-0402c) · 127 m away
- 97 Trinity StOct 20, 201499 trinity tower - demolition, clearing, and piers · 128 m away
- 327 E Cesar Chavez StMay 14, 2025Install main id sign on front facade canopy illuminated channel letters on a raceway using existing primary electrical · 157 m away
- 85 Trinity StNov 14, 2024Installation of warning lines on rooftop to meet osha safety standards · 161 m away
More demolitions in 78701.