604 W 12th St
Austin, TX 78701
HVAC system replacements permitted at 604 W 12th St
Mechanical permits at 604 W 12th St cover replacement of the existing central heating and air system and a second-floor mini-split system. The mini-split permit was filed March 13, 2025, and the central-system permit was filed October 1, 2025; both are listed as final.
Summarized from City of Austin records · updated Oct 1, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 1, 2025
- since Mar 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 30, 2025
- IssuedOct 1, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 3, 2025
Passed final inspection Oct 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-124838 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of mini-split system replace existing 2nd floor system with mitsubishi multi zone heat pump
Replacement of mini-split system replace existing 2nd floor system with mitsubishi multi zone heat pump
City of Austin permitMechanical PermitFinal- Record
- 2025-029164 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 604 W 12th St
What is being built at 604 W 12th St in Austin?
The permits describe HVAC replacements, not a new building: a second-floor mini-split system and the existing central heating and air system.
When were the HVAC permits filed at 604 W 12th St?
The mini-split replacement permit, 2025-029164 MP, was filed March 13, 2025. The central-system replacement permit, 2025-124838 MP, was filed October 1, 2025.
What does permit 2025-124838 MP cover?
The City of Austin permit describes replacement of the complete existing central heat and air system, with or without duct work. It was filed October 1, 2025, and is listed as final.
What does permit 2025-029164 MP cover?
It covers replacement of the existing second-floor mini-split system with a Mitsubishi multi-zone heat pump. The permit was filed March 13, 2025, and is listed as final.
Is a new building being constructed at 604 W 12th St?
The records provided show two mechanical permits for HVAC system replacements. They do not describe new building construction.
What work is happening near Pease Community Campus Phase 1?
At 604 W 12th St, about 170 meters from Pease Community Campus Phase 1, City of Austin permits describe replacement of existing heating and cooling systems.
Also being built nearby
All of 78701- 1201 Rio Grande StMay 16, 2024**water main replacement- commercial- approx 20 of water main; 1201 rio grande #100 78701 · 46 m away
- 1209 Rio Grande StAug 25, 2026Acc rio grande campus - w. 13th street site improvements · 68 m away
- 506 W 12th StFeb 16, 2024Repair and replace existing open air carport with prefabricated structure with metal roof · 80 m away
- 1205 Nueces StDec 15, 2023Tac-1205 nueces street · 84 m away
- 1108 Nueces StOct 14, 2026Retroactive building permit for installation of 4 bedroom within existing units. building plans on file approved for 4 bedrooms and align with final inspections and certificate of occupancy on file · 85 m away
- 1106 Nueces StMay 7, 20191106 nueces, llc (with r sp-2018-0119c) · 92 m away
- 509 W 12th StJul 16, 2024Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 1209 Nueces StMar 2, 2007Texas association of business · 99 m away
- 1212 Rio Grande StJan 21, 2022Acc 1212 rio grande · 119 m away
- 1204 San Antonio StNov 16, 2026Remove and replace the existing leaking and corroded 1-1/2 rpz backflow prevention assembly located in the fourth-floor air handler room · 134 m away
- 1100 Nueces StMar 2, 2007Walters southwest · 144 m away
- 1210 San Antonio StNov 5, 2026Eplan: commercial expedited review - interior remodel to existing office - phase 6a - 4th floor outdoor trellis. (131364 sq ft total) · 147 m away