606 W 15th St
Austin, TX 78701
Sewer line repair permitted at 606 W 15th St
A permit indicates repair work on a collapsed sewer line beneath the building slab at 606 W 15th St. The City of Austin issued the plumbing permit on May 8, 2024, for access work and replacement of about 10 feet of 4-inch pipe.
Summarized from City of Austin records · updated May 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2024
- since May 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepair collapsed sewer line piping under building slab. create an access hole bore a small tunnel and repair piping. about 10 feet of f 4 pipe will be replaced
- AppliedApr 11, 2024
- IssuedMay 8, 2024
- WorkMay '24 – Jul '24
- Final inspectionJul 11, 2024
Passed final inspection Jul 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepair collapsed sewer line piping under building slab. create an access hole bore a small tunnel and repair piping. about 10 feet of f 4 pipe will be replaced
Repair collapsed sewer line piping under building slab. create an access hole bore a small tunnel and repair piping. about 10 feet of f 4 pipe will be replaced
City of Austin permitPlumbing PermitFinal- Record
- 2024-045644 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 606 W 15th St
What is happening at 606 W 15th St in Austin?
A City of Austin plumbing permit indicates repair of a collapsed sewer line beneath the building slab. The work includes creating an access hole, boring a small tunnel, and replacing about 10 feet of 4-inch pipe.
When was the sewer repair permit issued?
The City of Austin issued permit 2024-045644 PP on May 8, 2024. Its recorded status is Final.
Is a new building being built at 606 W 15th St?
The available permit record is for sewer line repair, not construction of a new building.
What kind of plumbing work is planned at 606 W 15th St?
The permit describes repairing collapsed sewer piping beneath the building slab. About 10 feet of 4-inch pipe is to be replaced.
What is happening near Scenic Capital Investors on West 15th Street?
At 606 W 15th St, about 149 meters from Scenic Capital Investors at 502 W 15th St, a permit indicates sewer line repair beneath a building slab. The permit was issued May 8, 2024.
Also being built nearby
All of 78701- 1500 Rio Grande StJun 30, 20261500 rio grande street (with r c8-2025-0013.0a) · 60 m away
- 1500-1/2 Rio Grande StDec 20, 2019Austin bar parking plan · 77 m away
- 510 W 15th StAug 5, 2024Illuminated cabinet for abby learning center #24-0862- sign d · 91 m away
- 1410 Rio Grande StMar 27, 2024Replace roof · 93 m away
- 712 W 16th StFeb 17, 2025Eplan-expedited review: interior remodel to existing accessory garage (731 sq ft). **request to disconnect and connect · 108 m away
- 515 W 15th StJul 20, 2026Replace a 20 foot section of sewer line. a tree permit will be required and i will pull it as soon as i have all the info · 109 m away
- 506 W 15th StJul 24, 2025Change of use no remodel. change from existing law office to professional offices for medical therapy center (austin behavioral therapy). [7 day review] · 111 m away
- 1501 West AveJul 27, 2026Gas repair/restore service · 122 m away
- 1411 West AveMar 2, 2007Scofield loading structure · 129 m away
- 1504 San Antonio StMar 2, 2007Universal concepts · 148 m away
- 502 W 15th St · Scenic Capital InvestorsSep 30, 2026Finish out for admin office · 149 m away
- 1607 Nueces StJul 27, 2026Re-roof - remove old metal roof install new metal one · 164 m away