A plumbing permit filed March 20, 2026, covers replacing corroded cast-iron pipe beneath the slab using tunnel excavation. The permit describes approximately 160 feet of work and is marked final.
Summarized from City of Austin records · updated Mar 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 20, 2026
- since Mar 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace corroded cast iron under slab via tunnel excavation. approximately 160ft
Replace corroded cast iron under slab via tunnel excavation. approximately 160ft
City of Austin permitPlumbing PermitFinal- Record
- 2026-032415 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 707 E Cesar Chavez St
What work is permitted at 707 E Cesar Chavez St?
A City of Austin plumbing permit covers replacing corroded cast-iron pipe beneath the slab using tunnel excavation. It describes approximately 160 feet of work.
When was the plumbing work permitted at 707 E Cesar Chavez St?
The permit was filed on March 20, 2026. Its status is listed as final.
What is permit 2026-032415 PP for in Austin?
Permit 2026-032415 PP covers underslab plumbing work at 707 E Cesar Chavez St: replacing corroded cast-iron pipe via tunnel excavation.
How much pipe is being replaced at 707 E Cesar Chavez?
The permit description says the tunnel excavation is approximately 160 feet. It does not provide a project valuation.
Is a new building being built at 707 E Cesar Chavez St?
The record provided is for a plumbing permit to replace corroded pipe beneath the slab; it does not describe a new building.
Also being built nearby
All of 78701- 707 Cesar Chavez StMar 2, 2007International house of pancakes (ihop)
- 95 Rainey StMar 27, 2014Rainey and driskill · 65 m away
- 710 E Cesar Chavez StMay 22, 2025Loose meter can repair and anchor- only needed to get power back · 82 m away
- 96 Rainey StNov 12, 2026Installation of fireline · 85 m away
- 100-1/2 Sabine StOct 28, 2020Palm park utility relocation · 87 m away
- 604 Driskill StMar 9, 20262026/03/12 - 2026/03/14 | (2026/03/10 - 2026/03/15) | kap media sxsw projection site for fairmont image #sxswaffiliated · 97 m away
- 94 Rainey StJun 5, 201494 rainey street · 100 m away
- 91 Rainey StJan 21, 2022Anthem restaurant · 102 m away
- 90 Rainey StMay 30, 202590 rainey (with r spc-2019-0093c) · 122 m away
- 610 Davis StSep 8, 202690 rainey · 135 m away
- 89 Rainey StFeb 28, 2014Rainey and driskill-site demolition and utility relocation · 142 m away
- 97-1/2 Red River StApr 2, 2024Austin loop transportation system · 142 m away