809 Congress Ave
Austin, TX 78701
Demolition permitted for 1925 restaurant at 809 Congress Ave
A City of Austin permit filed May 21, 2026, calls for demolishing an approximately 3,611-square-foot restaurant building dating to around 1925 at 809 Congress Ave. A separate permit filed June 2, 2026, covers capping the water and wastewater connections; the records do not specify what will replace the building.
Summarized from City of Austin records · updated Jun 22, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 22, 2026
- since Aug 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsCap off water & waste water
Cap off water & waste water
City of Austin permitPlumbing PermitFinal- Record
- 2026-064388 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Demolition of an approximately 3611 sq ft restaurant building circa 1925. 2026 015015 da - approved
Demolition of an approximately 3611 sq ft restaurant building circa 1925. 2026 015015 da - approved
City of Austin permitBuilding PermitActive- Record
- 2026-062859 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 809 Congress Ave
What is happening at 809 Congress Ave?
A City of Austin building permit calls for demolition of an approximately 3,611-square-foot restaurant building dating to around 1925. The permit, 2026-062859 BP, was filed May 21, 2026.
What is replacing the restaurant at 809 Congress Ave?
The records provided do not specify what will replace the building. A site plan case for 809 Congress Ave was approved and released on August 13, 2025, but the case details do not describe a replacement project.
When was the demolition permit filed for 809 Congress Ave?
The City of Austin filed demolition permit 2026-062859 BP on May 21, 2026. It describes demolition of an approximately 3,611-square-foot restaurant building.
Is the building at 809 Congress Ave being demolished near Suite 700?
Yes. The demolition permit is for 809 Congress Ave, about 27 meters from Suite 700 at 823 Congress Ave. The permit was filed May 21, 2026.
What permits have been filed for 809 Congress Ave?
City records include a site plan case approved and released August 13, 2025, a demolition permit filed May 21, 2026, and a plumbing permit filed June 2, 2026, to cap water and wastewater connections. A second site plan case was closed June 22, 2026.
Also being built nearby
All of 78701- 823 Congress Ave · 823 CongressNov 10, 2026Floor 3: replacement of old cooling tower on level 3 roof and install of associated accessories · 27 m away
- 823 Congress · 823 CongressNov 6, 2024Icf — renovation/alteration — interior remodel to an existing suite · 35 m away
- 811 Congress AveSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 816 Congress Avenue · Dawn Mask - Regent PropertiesMar 11, 2025Valero austin pac — renovation/alteration — renovations to an existing tenant space in an existing building · 49 m away
- 816 Congress Ave · 816 Congress Investment, LLCOct 5, 2026Institute for justice — renovation/alteration — interior alteration of an existing office space · 49 m away
- 816 Congress 18th · 816 Congress Investment, LLCApr 27, 2026Acrisure austin — renovation/alteration — minor renovations to existing 16,665 square foot office space. modifications to existing layout, ceilings, lighting, and updates to finish materials · 49 m away
- 816 Congress · 816 Congress Investment LLCMar 26, 2024816 congress suite 1100 — renovation/alteration — minor renovation to existing suite · 49 m away
- 801 Congress AveJul 7, 2025Replacement of complete existing central heat and air system with or without duct work replace 10-ton condensing unit and air handler replace 15-ton condensing unit and air handler condensing units located on 4th-floor rooftop pad. crane lift required for removal and installation · 50 m away
- 721 Congress AveFeb 25, 202527795 - hyatt centric - tradition illuminated sign · 62 m away
- 800 Congress AveDec 12, 2014800 congress avenue · 68 m away
- 800 Brazos StAug 29, 2025Reroof · 77 m away
- 905 Congress AveFeb 19, 2026Restoration of interior finishes and millwork due to fire/water damage. include replacement of damaged roofing skylights and rooftop equipment · 81 m away