1110 Concho St
Austin, TX 78702
1110 Concho St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1110 Concho St, Austin, TX 78702 since March 2, 2007. The most recent, filed January 21, 2022, covers: “Holy cross catholic church family life center”.
Compiled from City of Austin records · updated Jan 21, 2022
- Projects
- 2
- 2 filings
- Latest filing
- Jan 21, 2022
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 1110 Concho St
What is being built at 1110 Concho St?
The latest filing (City of Austin case 11603450, January 21, 2022) covers holy cross catholic church family life center.
How many permits and filings does 1110 Concho St have?
2 filings across 2 projects, from March 2, 2007 to January 21, 2022.
What is being built near Austin Independent School District in Austin?
1110 Concho St is about 115 m from Austin Independent School District (1712 E 11th St). Its latest filing is for holy cross catholic church family life center.
Is there other construction near 1110 Concho St?
Yes. Nearby filings include 1134 Concho St (new construction in-ground pool and spa, Mar 28, 2024); 1712 E 11th St (removal of existing roofing system on the entire school with a new pvc roofing system. / removal and disposal of existing mechanical roofing support members. also work includes replacing of 8 existing skylights/ installed of through wall overflow rains aisd project, Jun 29, 2026); 1417 Rosewood Ave (rosewood village sec 11, resub of lot 4-b (smart housing) — rosewood village sec 11, resub of lot 4-b (smart housing), Mar 2, 2007).
How do I get alerts for new permits at 1110 Concho St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 1134 Concho StMar 28, 2024New construction in-ground pool and spa · 67 m away
- 1712 E 11th St · Austin Independent School DistrictJun 29, 2026Removal of existing roofing system on the entire school with a new pvc roofing system. / removal and disposal of existing mechanical roofing support members. also work includes replacing of 8 existing skylights/ installed of through wall overflow rains aisd project · 115 m away
- 1417 Rosewood AveMar 2, 2007Rosewood village sec 11, resub of lot 4-b (smart housing) — rosewood village sec 11, resub of lot 4-b (smart housing) · 121 m away
- 1616 E 10th StFeb 17, 2026Water heater replace · 152 m away
- 1319 Rosewood AveOct 17, 2025Replacing the gas line inside the house · 164 m away
- 1504 E 11th StJun 1, 2026Retroactive interior remodel- retroactive interior remodel: convert kitchen to two bathrooms and bathroom area to kitchen space. repair and replace damaged sheetrock and framing. replace all electric and plumbing. new roof. new ac and heat · 169 m away
- 1100 Angelina StJun 27, 2025200-amp meter and main panel upgrade · 177 m away
- 1502 E 11th StJul 31, 2025Install new mini split in backyard addition · 182 m away
- 1309 Rosewood AveJan 16, 2026Change of use from retail to restaurant · 206 m away
- 1129 Leona StNov 21, 2023Excavate roughly 50 feet of outside sewer yard line and replace with schedule 40 pvc. bed new line with sand per code · 209 m away
- 1410 E 11th StApr 14, 2026Interior remodel removing one bedroom and adding one bathroom. opening up kitchen and new wh. plumbing and electrical fixtures hvac work. replace a couple of piers foundation · 210 m away
- 1154 Angelina StAug 10, 2026Bringing existing meters & disconnects up to code · 211 m away