112 Medina
Austin, TX 78702
Sewer line replacement permitted at 112 Medina
A City of Austin plumbing permit indicates roughly 45 of sewer line replacement toward the city tap at 112 Medina. The permit was filed May 29, 2025, and is listed as final.
Summarized from City of Austin records · updated May 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 29, 2025
- since May 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRoughly 45 of sewer line replacement toward city tap
- AppliedMay 13, 2025
- IssuedMay 29, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 11, 2025
Passed final inspection Jun 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectRoughly 45 of sewer line replacement toward city tap
Roughly 45 of sewer line replacement toward city tap
City of Austin permitPlumbing PermitFinal- Record
- 2025-059420 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 112 Medina
What is happening at 112 Medina in Austin?
A City of Austin plumbing permit covers roughly 45 of sewer line replacement toward the city tap. It was filed May 29, 2025, and is listed as final.
What was permitted at 112 Medina?
Permit 2025-059420 PP covers sewer line replacement toward the city tap. The description says roughly 45, without specifying a unit.
When was the sewer work at 112 Medina permitted?
The permit was filed May 29, 2025. Its status is listed as final.
Is a new building being built at 112 Medina?
The record provided is for a plumbing permit describing sewer line replacement toward the city tap. It does not describe construction of a new building.
What is happening near the 1006 E Cesar Chavez office remodel?
At 112 Medina, about 73 meters from the listed 1006 E Cesar Chavez Office Remodel landmark, a City of Austin permit covers roughly 45 of sewer line replacement toward the city tap. The permit was filed May 29, 2025.
Also being built nearby
All of 78702- 105 San Marcos StNov 4, 2024New portable building installation of classroom for religious assembly · 47 m away
- 104 MedinaSep 8, 2026Interior remodel to existing 2 story structure. [7 day review] · 51 m away
- 1000 Cesar Chavez StMar 2, 20071000 east site improvements · 67 m away
- 1010 E Cesar Chavez StSep 23, 2026Interior remodel to existing restaurant with dining room addition · 72 m away
- 1006 E Cesar Chavez St · Above The Mucky-Muck LLCOct 5, 20261006 e cesar chavez office remodel — renovation/alteration — work includes reconfiguration of interior partitions to provide reception, private offices, a conference room, storage, and restroom improvements; associated door, finish, ceiling, lighting, mechanical, electrical, and plumbing work · 73 m away
- 205 MedinaNov 5, 2026Construct new driveway approach of 12 ft · 74 m away
- 1103 E 2nd StJul 14, 2025Express: drywall repair insulation repair electrical/plumbing fixture repair · 75 m away
- 1100 E 2nd StSep 2, 2025Capoff for water and wastewater for total demolition of duplex 1440 sq ft circa 1900 · 85 m away
- 104 Medina St · Urth Caffe BakeryApr 28, 2025Urth caffe bakery — renovation/alteration — project consists of renovation to existing building (wd framed structure) to convert to a bakery commissary building · 85 m away
- 909 E 2nd StJul 9, 2026.ran camera down left side of home encountered three major bellies two disconnected main lines because of a combination of cast-iron and pvc house was built in the 50s or 60s in order to accomplish this repair we must trench from the clean out to the city tap going towards the backyard in a straight line about 100 feet then going underneath the home. we need to do a 7 foot tunnel even though the home is on pure and beam where the cleanout is is underground and then pops up to the first downstairs bathroom we need to expose that bathroom shower sink and toilet and re-pipe those branch lines to the main line · 89 m away
- 1102 Cesar Chavez StMar 2, 2007Big red sun · 91 m away
- 1010 East Cesar Chavez · Urth CaffeApr 28, 2025Urth caffe restaurant — renovation/alteration — project consists of building renovation to interior of existing restaurant structure and wood framed addition to existing restaurant structure · 92 m away