City of Austin permits indicate a 9.345 kW rooftop solar system, a Powerwall 3 battery and a Level 2 EV charger at 1304 Alamo St. The solar and battery permits were filed December 29 and 31, 2025, and the EV charger permit was filed February 5, 2026; all three are listed as final.
Summarized from City of Austin records · updated Feb 5, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 5, 2026
- since Dec 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLevel 2 ev charger installation
- AppliedFeb 5, 2026
- IssuedFeb 5, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 10, 2026
Passed final inspection Mar 10, 2026.
1 contact on this project
Permit & project history
3 projectsLevel 2 ev charger installation
Level 2 ev charger installation
City of Austin permitElectrical PermitFinal- Record
- 2026-013923 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of a tesla powerwall 3 with a 9.345kw solar panel system. potential shutdown needed
Installation of a tesla powerwall 3 with a 9.345kw solar panel system. potential shutdown needed
City of Austin permitElectrical PermitFinal- Record
- 2025-162751 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
9.345 kw roof mounted solar + 1 powerwall 3 battery
9.345 kw roof mounted solar + 1 powerwall 3 battery
City of Austin permitElectrical PermitFinal- Record
- 2025-153923 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1304 Alamo St
What is being installed at 1304 Alamo St?
City permits indicate a 9.345 kW rooftop solar system, a Powerwall 3 battery and a Level 2 EV charger.
Is there a solar panel installation planned at 1304 Alamo St?
Yes. Permit 2025-153923 EP, filed December 29, 2025, lists a 9.345 kW roof-mounted solar system and one Powerwall 3 battery.
Is a battery being installed at 1304 Alamo St?
Yes. Permit 2025-162751 EP, filed December 31, 2025, describes a Tesla Powerwall 3 with a 9.345 kW solar panel system.
Will 1304 Alamo St have an EV charger?
A Level 2 EV charger installation is listed in Austin permit 2026-013923 EP, filed February 5, 2026.
When were permits filed for work at 1304 Alamo St?
The solar and battery permits were filed December 29 and 31, 2025. The Level 2 EV charger permit was filed February 5, 2026.
Also being built nearby
All of 78702- 2002 E 13th StJun 12, 2024Replacement of an existing water heater in unit b (unable to find exact home via city search) · 56 m away
- 2101 E 14th StSep 13, 2024(grafton james) - installation of circuit for elec. vehicle charging station - esip · 60 m away
- 2003 E 13th StJul 31, 2024Repairing service riser that was pulled by a fallen tree branch · 79 m away
- 2006 E 14th StSep 24, 2025Change main fpe panel box add supplemental grounding add whole home surge protection · 90 m away
- 2001 E 13th StNov 27, 2024Wire 200 square foot shed · 99 m away
- 2109 E 14th StJul 23, 2026Unit a- 2109 e 14 (3 beds 2.5 baths front and rear covered porch and carport · 104 m away
- 1306 Coleto StJul 23, 2026Unit b-1306 coleto (2 bed 2.5 bath front covered porch and carport · 104 m away
- 1909 E 14th StAug 12, 2026Relocation of single-story sfr 965 sq ft circa 1922 to outside coa · 107 m away
- 2000 E 14th StJul 1, 2024Express: foundation repair · 109 m away
- 1405 Alamo StJun 20, 2024Install level 2 ev charger as per austin energy plug-in guidelines · 116 m away
- 1208 Coleto StOct 23, 2026Coleto division · 119 m away
- 1908 E 14th StJul 1, 2026Tx gas has a leak in the main and is replacing the steel line with poly pipe. they want us to move the meter 10 away from the tankless to be in compliance with the gas code · 131 m away
More solar installs in 78702.