1500 E 4th St
Austin, TX 78702
1500 E 4th St: 3 projects on record
City of Austin lists 3 filings across 3 projects at 1500 E 4th St, Austin, TX 78702. The most recent, filed March 3, 2025, covers: “2025/03/07 thru 2025/03/09 -(#sxsw) faith based conference involving panels keynote speakers and music”.
Compiled from City of Austin records · updated Mar 3, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Mar 3, 2025
- since Mar 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projects2025/03/07 thru 2025/03/09 -(#sxsw) faith based conference involving panels keynote speakers and music
2025/03/07 thru 2025/03/09 -(#sxsw) faith based conference involving panels keynote speakers and music
City of Austin permitBuilding PermitExpired- Record
- 2025-025206 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Event with 480 sq ft stage for 12 occupants
Event with 480 sq ft stage for 12 occupants
City of Austin permitBuilding PermitExpired- Record
- 2025-025211 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from office warehouse to indoor entertainment
Change of use from office warehouse to indoor entertainment
City of Austin permitMechanical PermitFinal- Record
- 2022-168554 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1500 E 4th St
What is being built at 1500 E 4th St?
The latest filing (City of Austin permit 2025-025206 BP, March 3, 2025) covers 2025/03/07 thru 2025/03/09 -(#sxsw) faith based conference involving panels keynote speakers and music.
How many permits and filings does 1500 E 4th St have?
3 filings across 3 projects, from March 3, 2025 to March 3, 2025.
What is being built near Capital Metropolitan Transportation Authority in Austin?
1500 E 4th St is about 74 m from Capital Metropolitan Transportation Authority (1501 E 5th St 170 Bolton Dr). Its latest filing is for 2025/03/07 thru 2025/03/09 -(#sxsw) faith based conference involving panels keynote speakers and music.
Is there other construction near 1500 E 4th St?
Yes. Nearby filings include 1508 E 4th St (demolition of fire damaged structure. new pre-engineered mental building shell with partial new slab and new electrical service. no plumbing or mechanical. no for occupancy, Nov 7, 2024); 1501 E 5th St 170 Bolton Dr (plaza saltillo station double track and trail project — renovation/alteration — change from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. total 2944 sq ft under 4 canopies, Jun 15, 2026); 400 Comal St (higher spirits rooftop lounge, Nov 6, 2026).
How do I get alerts for new permits at 1500 E 4th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 1508 E 4th StNov 7, 2024Demolition of fire damaged structure. new pre-engineered mental building shell with partial new slab and new electrical service. no plumbing or mechanical. no for occupancy · 59 m away
- 1501 E 5th St 170 Bolton Dr · Capital Metropolitan Transportation AuthorityJun 15, 2026Plaza saltillo station double track and trail project — renovation/alteration — change from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. total 2944 sq ft under 4 canopies · 74 m away
- 400 Comal StNov 6, 2026Higher spirits rooftop lounge · 75 m away
- 412 Comal StApr 1, 2025Replace roof tiles with like tiles · 85 m away
- 400 Comal Street · 400 Comal Venture Group LPNov 12, 2024Boheme hotel — renovation/alteration — renovation of existing 29,000sf multifamily development to become hotel use. existing lobby will be renovated to hotel entrance and cocktail bar. 20 residential units to become hotel units (6 suites, 14 studios). new rooftop amenity · 88 m away
- 1405 E 4th StFeb 11, 2026Replacement of an existing water heater replace 40-gallon gas water heater · 92 m away
- 413 Navasota StApr 17, 2020Talavera lofts · 107 m away
- 405 Comal StJan 5, 2026Solar installation 87.75 kw dc (161x545w panels) on an existing commercial roof · 108 m away
- 1401 E 5th St · 1401 E 5thJan 10, 2024Peachy e austin — renovation/alteration — first generation interior build out · 129 m away
- 500 Comal StFeb 4, 2026Reconnect existing building to new austin energy pole mounted transformer. provide a new exterior 400a 120/208v main panel and transocket per ae · 131 m away
- 1503 E 6th StJun 23, 20262026/06/27 | 1 day free public event featuring small mini pitches live music activations and f&b · 143 m away
- 1601 E 5th StMay 11, 2026Change exception from office to food outlet approved. no remodelling work is taking place · 150 m away