412 Comal St
Austin, TX 78702
Roof tile replacement permitted at 412 Comal St
A City of Austin permit record indicates a like-for-like roof tile replacement at 412 Comal St. The permit, 2025-004050 BP, was filed April 1, 2025, and is marked expired.
Summarized from City of Austin records · updated Apr 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2025
- since Apr 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace roof tiles with like tiles
Replace roof tiles with like tiles
City of Austin permitBuilding PermitExpired- Record
- 2025-004050 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 412 Comal St
What is being built at 412 Comal St in Austin?
The permit record describes replacing roof tiles with like tiles; it does not describe a new building. Permit 2025-004050 BP was filed April 1, 2025, and is marked expired.
What work was permitted at 412 Comal St?
The City of Austin permit describes a like-for-like roof tile replacement. It does not list a project area or valuation.
Is the 412 Comal St permit still active?
No. City of Austin permit 2025-004050 BP is marked expired. It was filed April 1, 2025.
When was the roof work at 412 Comal St permitted?
The permit was filed April 1, 2025. Its record describes replacing roof tiles with like tiles.
What work is planned near 400 Comal Venture Group?
At 412 Comal St, about 72 meters from 400 Comal Venture Group, a City of Austin permit describes replacing roof tiles with like tiles. The permit is marked expired.
Also being built nearby
All of 78702- 1508 E 4th StNov 7, 2024Demolition of fire damaged structure. new pre-engineered mental building shell with partial new slab and new electrical service. no plumbing or mechanical. no for occupancy · 42 m away
- 405 Comal StJan 5, 2026Solar installation 87.75 kw dc (161x545w panels) on an existing commercial roof · 55 m away
- 400 Comal StNov 6, 2026Higher spirits rooftop lounge · 59 m away
- 1601 E 5th StMay 11, 2026Change exception from office to food outlet approved. no remodelling work is taking place · 70 m away
- 500 Comal StFeb 4, 2026Reconnect existing building to new austin energy pole mounted transformer. provide a new exterior 400a 120/208v main panel and transocket per ae · 71 m away
- 400 Comal Street · 400 Comal Venture Group LPNov 12, 2024Boheme hotel — renovation/alteration — renovation of existing 29,000sf multifamily development to become hotel use. existing lobby will be renovated to hotel entrance and cocktail bar. 20 residential units to become hotel units (6 suites, 14 studios). new rooftop amenity · 72 m away
- 1500 E 4th StMar 3, 2025Event with 480 sq ft stage for 12 occupants · 85 m away
- 1501 E 5th St 170 Bolton Dr · Capital Metropolitan Transportation AuthorityJun 15, 2026Plaza saltillo station double track and trail project — renovation/alteration — change from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. total 2944 sq ft under 4 canopies · 87 m away
- 1503 E 6th StJun 23, 20262026/06/27 | 1 day free public event featuring small mini pitches live music activations and f&b · 110 m away
- 1511 E 6th StFeb 2, 2026Replace existing vent hood · 115 m away
- 1501 E 6th StJun 6, 2024Eplan: commercial expedited review - first time finish out for multi family building level 5 · 116 m away
- 1512 E 6th StDec 10, 2025Need to move main gas line underneath pier beam about 8 ft because the gas meter is being relocated · 160 m away