Plaza Saltillo Station set for double-track work
A project to convert the single track at Plaza Saltillo Station to double track, add passenger platforms and canopies, and relocate utilities was registered on June 15, 2026. The TDLR registration describes 2,944 square feet under four canopies, along with right-of-way flatwork.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 15, 2026
- since Jun 15, 2026
- Largest scope
- 2,944 sf
- Estimated cost
- $41M
- state registration
Where this project stands
In state plan reviewPlaza Saltillo Station Double Track and Trail Project
2,944 sq ft · $41M est.
- RegisteredJun 15, 2026
- Plan reviewnow
- ConstructionJun '27 – Jun '28
- Inspected
- Closed
Construction is scheduled to start Jun 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectChange from single track to double track, build platforms and canopies for passenger waiting area, associated utility relocations and right of way flatwork. total 2944 sq ft under 4 canopies — cap metro plaza saltillo station
TDLR project registrationRenovation/AlterationProject Registered2,944 sq ft$41M est.- Project #
- TABS2026022872
- Tenant / owner
- Plaza Saltillo Station Double Track And Trail Project
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1501 E 5th St 170 Bolton Dr
What is being built at 1501 E 5th St?
A project at Plaza Saltillo Station will convert the track from single to double, add passenger platforms and canopies, and include utility relocations and right-of-way flatwork. It was registered with TDLR on June 15, 2026, as project TABS2026022872.
Is Plaza Saltillo Station getting a second track?
The TDLR project registration describes changing the station from a single track to a double track. It was filed June 15, 2026.
What is the Plaza Saltillo Station project adding?
The project description includes passenger platforms and four canopies, with a total of 2,944 square feet under the canopies. It also lists utility relocations and right-of-way flatwork.
How much will the Plaza Saltillo Station project cost?
The TDLR registration lists an applicant-estimated project cost of $40,615,944.
What is being built near Material on East 6th Street?
Near Material, at 1401 E 6th St, the Plaza Saltillo Station project is registered for double-track work, passenger platforms and canopies, utility relocations, and right-of-way flatwork. The registration was filed June 15, 2026.
When was the Plaza Saltillo Station project registered?
The project was registered with the Texas Department of Licensing and Regulation on June 15, 2026. Its registration number is TABS2026022872.
Also being built nearby
All of 78702- 1500 E 4th StMar 3, 2025Event with 480 sq ft stage for 12 occupants · 74 m away
- 1503 E 6th StJun 23, 20262026/06/27 | 1 day free public event featuring small mini pitches live music activations and f&b · 75 m away
- 500 Comal StFeb 4, 2026Reconnect existing building to new austin energy pole mounted transformer. provide a new exterior 400a 120/208v main panel and transocket per ae · 83 m away
- 412 Comal StApr 1, 2025Replace roof tiles with like tiles · 87 m away
- 1508 E 4th StNov 7, 2024Demolition of fire damaged structure. new pre-engineered mental building shell with partial new slab and new electrical service. no plumbing or mechanical. no for occupancy · 97 m away
- 413 Navasota StApr 17, 2020Talavera lofts · 99 m away
- 1401 E 5th St · 1401 E 5thJan 10, 2024Peachy e austin — renovation/alteration — first generation interior build out · 101 m away
- 1501 E 6th StJun 6, 2024Eplan: commercial expedited review - first time finish out for multi family building level 5 · 101 m away
- 1401 E 6th St · Centro North LPJul 22, 20267 day - interior tenant finish out of a first generation office space - ova · 101 m away
- 1511 E 6th StFeb 2, 2026Replace existing vent hood · 116 m away
- 400 Comal StNov 6, 2026Higher spirits rooftop lounge · 120 m away
- 405 Comal StJan 5, 2026Solar installation 87.75 kw dc (161x545w panels) on an existing commercial roof · 137 m away