Level 2 EV charger permitted at 1603 Clifford Ave
A permit indicates prewiring and installation of a Level 2 EV charger at 1603 Clifford Ave. The City of Austin permit was filed on August 24, 2026, and is marked final.
Summarized from City of Austin records · updated Aug 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 24, 2026
- since Aug 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPrewire and install a level 2 ev charger
- AppliedAug 19, 2026
- IssuedAug 24, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 31, 2026
Passed final inspection Aug 31, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectPrewire and install a level 2 ev charger
Prewire and install a level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-108837 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1603 Clifford Ave
What work is permitted at 1603 Clifford Ave?
A City of Austin electrical permit covers prewiring and installation of a Level 2 EV charger. The permit number is 2026-108837 EP.
When was the EV charger permit filed?
The permit was filed on August 24, 2026.
Is the permit for 1603 Clifford Ave final?
Yes. City of Austin records list permit 2026-108837 EP as final.
Is a new building being constructed at 1603 Clifford Ave?
The permit describes prewiring and installation of a Level 2 EV charger, not construction of a new building.
What type of EV charger is being installed at 1603 Clifford Ave?
The permit description specifies a Level 2 EV charger.
Also being built nearby
All of 78702- 1602 Sanchez StAug 4, 2026Express: foundation repair · 36 m away
- 1600 Sanchez StDec 2, 2025Replace hot and cold water lines for bathroom kitchen and laundry. cut 1 14x14 holes in 2 different walls. the rest will be ran through the attic. under 100ft total · 38 m away
- 1604 Sanchez StNov 27, 2023Express - foundation repair - reset and reshim 450 sq ft 10ft 4x6 install 2 sonotubes · 40 m away
- 1609 Clifford AveApr 22, 2025For main service panel upgrade 225a rated and requires meter can and riser upgrade with installation of solar panels · 48 m away
- 1408 Sanchez StAug 13, 2026Express: handicap ramp · 78 m away
- 1701 Clifford AveSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 1404 Sanchez StOct 23, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 90 m away
- 1702 Clifford AveJul 20, 2026Replacement of mini-split system dls for detached studio space · 110 m away
- 1404 Clifford AveMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 2920 E 16th StApr 21, 2025Express: replace roof/decking on rear porch cover replace decking boards misc plumbing replace/repair wall heater misc electrical · 126 m away
- 1403 Sanchez StMay 18, 2026Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 2919 E 16th StFeb 4, 2025Converting a bedroom to a master bathroom. an existing closet wall separating the two rooms will be partially opened to the allow entry to the master bathroom from the bedroom. the new master bathroom will include the relocation of an existing shower + addition of the one toilet and 2 sinks. there will also need to be an exhaust fan added to the new shower area · 131 m away