1607 Holly St
Austin, TX 78702
Holly Street home gets HVAC and electrical upgrades
Permits indicate upgrades to the existing residence at 1607 Holly St, including a replacement central heating and air system and a 200-amp electrical service replacement. The electrical permit was filed October 30, 2025, and is final; the mechanical permit was filed September 17, 2026, and is active.
Summarized from City of Austin records · updated Sep 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 17, 2026
- since Oct 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 16, 2026
- IssuedSep 17, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-122002 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
200 amp service replacement
200 amp service replacement
City of Austin permitElectrical PermitFinal- Record
- 2025-136968 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1607 Holly St
What work is happening at 1607 Holly St in Austin?
City of Austin permits indicate a replacement central heating and air system and a 200-amp electrical service replacement at the residence.
Is a new home being built at 1607 Holly St?
The available permits describe work on an existing residence, not construction of a new home.
When was the HVAC permit filed for 1607 Holly St?
The mechanical permit, 2026-122002 MP, was filed September 17, 2026. It is listed as active.
What does permit 2026-122002 MP cover?
The City of Austin permit covers replacement of the complete existing central heat and air system, with or without duct work. It was filed September 17, 2026, and is active.
Was the electrical work at 1607 Holly St completed?
The 200-amp service replacement permit, 2025-136968 EP, is listed as final. It was filed October 30, 2025.
Also being built nearby
All of 78702- 1601 Holly StNov 20, 2024Change of use from residential suite a to child service (limited). no change in use for suite b. no interior and structural renovation no food service provided to the kids · 47 m away
- 1615 Holly StApr 25, 2024(gaytan tesla christian) - installation of ev charger bi-directional capable - esip · 49 m away
- 1608 Haskell StFeb 11, 2009Gorman subdivision (formerly tobin resub. of riverside) — gorman subdivision (formerly tobin resub. of riverside) · 50 m away
- 1617 Holly StFeb 27, 2026Express- replace shingle roof with a standing seam metal roof. replace existing siding with hardie plank siding. installation of insulation and zip board. replace existing doors and windows for the whole home · 66 m away
- 1600 Holly StSep 28, 2026Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 1401 Art Dilley Drive 36 Comal Street · Eqr-Weaver LPMar 30, 2025Base yoga — new construction — interior build out of previously unbuilt 1300 sq ft tenant space for fitness studio · 95 m away
- 1601 Haskell Street · Austin Independent School DistrictNov 26, 2024Martin middle school portables — new construction — place three new portable buildings on school site with ada ramp · 103 m away
- 45 Comal St, Previously 1601 Haskell St · Austin Independent School DistrictDec 20, 2024Martin middle school — renovation/alteration — new secure vestibule and interior renovations to admin, studios, maker space, cte, mental wellness and courtyard. replacing the existing kitchen grease trap and associated pluming, mechanical and electrical system upgrades · 103 m away
- 1605 Garden StFeb 5, 2025*partial demolition* interior remodel · 110 m away
- 1615 Garden StNov 13, 2024Addition of basement to an existing 2-story sfr adding 2 bed/1 bath · 126 m away
- 1510 Holly StMar 17, 2025Construct new driveway approach of 15.5 ft ***no sidewalk inspection per bp · 140 m away
- 1621 Garden StJun 15, 2026Express: painting adding new countertops new appliances new floors sinks toilets and hardware. we will most likely need new insulation replace the front door and some of the windows; meter replacement revision: i need to test the gas at the property. after speaking with my inspector (sean cockerill) and my plumber they mentioned that i need to add this to my express permit as opposed to having the plumber open up a new permit. i have a licensed plumber standing by to execute the work and id like to get it completed asap · 151 m away