An electrical permit covers repairs to the damaged service riser conduit and meter socket at 1626 Nash Hernandez Sr Rd. The City of Austin permit was filed on October 28, 2024, and is marked final; it specifies no change to the service size or load.
Summarized from City of Austin records · updated Oct 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2024
- since Oct 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAt 1626 nash hernandez senior rd. repair the damaged service riser conduit and meter socket only. existing a.e. service drop from a.e. pole number 237920. no change in service size or load
- AppliedOct 22, 2024
- IssuedOct 28, 2024
- WorkOct '24 – Nov '24
- Final inspectionDec 7, 2024
Passed final inspection Dec 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectAt 1626 nash hernandez senior rd. repair the damaged service riser conduit and meter socket only. existing a.e. service drop from a.e. pole number 237920. no change in service size or load
At 1626 nash hernandez senior rd. repair the damaged service riser conduit and meter socket only. existing a.e. service drop from a.e. pole number 237920. no change in service size or load
City of Austin permitElectrical PermitFinal- Record
- 2024-142042 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1626 Nash Hernandez Sr Rd
What is being built at 1626 Nash Hernandez Sr Rd?
The permit covers repair of the damaged service riser conduit and meter socket, not a new building. It specifies no change to the electrical service size or load.
What electrical work is planned at 1626 Nash Hernandez Sr Rd in Austin?
City of Austin electrical permit 2024-142042 EP covers repairs to the service riser conduit and meter socket. The permit was filed October 28, 2024, and is marked final.
When was the electrical permit for 1626 Nash Hernandez Sr Rd filed?
Permit 2024-142042 EP was filed on October 28, 2024. Its status is listed as final.
Is a new building going up near Austin Independent School District on Haskell Street?
The record for 1626 Nash Hernandez Sr Rd, about 338 meters from Austin Independent School District at 1601 Haskell Street, is for electrical repairs. It does not describe a new building.
What work is happening near Agc Rbj on Art Dilly Drive?
The permit at 1626 Nash Hernandez Sr Rd, about 279 meters from Agc Rbj at 1320 Art Dilly Dr, covers repair of the damaged service riser conduit and meter socket. It does not indicate a change to service size or load.
Also being built nearby
All of 78702- 1516 Nash Hernandez Sr RdMar 2, 2007Rebekah baines health center temporary std clinic · 39 m away
- 1503 Robert Weaver AveFeb 10, 2026Install new 9.20 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential · 206 m away
- 15 Waller StDec 4, 2024Replace existing emergency backup generator on existing pad · 208 m away
- 45 Comal StOct 27, 2026Installing the new 10-inch fire riser in the building · 257 m away
- 32 Chalmers AveMar 23, 2026Express: replace windows; replace shingle roof and decking · 261 m away
- 31 Navasota StApr 5, 2024Tenant finish out · 268 m away
- 1320 Art Dilly Dr · Agc Rbj LLCJun 9, 2026First time finish out for suite 1101 · 279 m away
- 1504 Robert Weaver AveAug 14, 2026Conduct level 1 diagnostic search for leaks on existing gas piping and appliance connections and pressure-test entire gas system · 295 m away
- 31 Chalmers AveSep 9, 2024Repair existing 125 amp old rag riser service to 200 amp meter and panel · 303 m away
- 1411 Haskell StAug 25, 2020Resubdivision of lot 3, less 53 feet thereof, block 2, magnolia addition · 317 m away
- 1601 Haskell Street · Austin Independent School DistrictNov 26, 2024Martin middle school portables — new construction — place three new portable buildings on school site with ada ramp · 338 m away
- 45 Comal St, Previously 1601 Haskell St · Austin Independent School DistrictDec 20, 2024Martin middle school — renovation/alteration — new secure vestibule and interior renovations to admin, studios, maker space, cte, mental wellness and courtyard. replacing the existing kitchen grease trap and associated pluming, mechanical and electrical system upgrades · 338 m away