1909 New York Ave

Austin, TX 78702

Backup battery system planned at 1909 New York Ave

An active electrical permit filed October 16, 2026, indicates installation of a backup battery system and an additional meter socket at 1909 New York Ave. A separate permit finalized August 26, 2024, covered a Level 2 EV charger and an 80-foot trench to the parking area.

Summarized from City of Austin records · updated Oct 16, 2026

Projects
2
2 filings
Latest filing
Oct 16, 2026
since Aug 26, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 22, 2026
  2. IssuedOct 16, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
19% through of the permit windowOct 16, 2026 → Apr 14, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 evse. includes 80 trench from main service at house to parking area at back of property

    Install level 2 evse. includes 80 trench from main service at house to parking area at back of property

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1909 New York Ave

What is being built at 1909 New York Ave in Austin?

An active City of Austin electrical permit indicates a backup battery system and an additional meter socket are being installed. The permit, 2026-124956 EP, was filed October 16, 2026.

When was the backup battery permit filed at 1909 New York Ave?

City of Austin permit 2026-124956 EP was filed October 16, 2026, and is listed as active.

Is there an EV charger at 1909 New York Ave?

A City of Austin electrical permit finalized August 26, 2024, covers installation of a Level 2 EV charging station. The permit description also mentions an 80-foot trench from the house’s main service to the rear parking area.

What electrical work is permitted at 1909 New York Ave?

Records show an active permit for a backup battery system and additional meter socket, plus a finalized permit for a Level 2 EV charger. The permits are 2026-124956 EP and 2024-107302 EP.

What is happening near Hell Or High Water on East 12th Street?

At 1909 New York Ave, about 219 meters from Hell Or High Water, an active electrical permit indicates installation of a backup battery system and additional meter socket. It was filed October 16, 2026.