groundranger
Recent · latest filing Aug 2026Residential

211 Tillery Sq

Austin, TX 78702

Like-for-like HVAC replacement at 211 Tillery Sq

An existing 2.5-ton heating and air-conditioning system is being replaced with a like-for-like system at 211 Tillery Sq. The City of Austin issued mechanical permit 2026-098274 MP on August 3, 2026; the permit describes no structural changes.

Summarized from City of Austin records · updated Aug 3, 2026

Projects
1
1 filings
Latest filing
Aug 3, 2026
since Aug 3, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work **davis plowden: replace existing 2.5-ton hvac system with like-for-like changeout; no structural change

  1. AppliedJul 29, 2026
  2. IssuedAug 3, 2026
  3. WorkAug '26 – Aug '26
  4. Final inspectionAug 11, 2026

Passed final inspection Aug 11, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work **davis plowden: replace existing 2.5-ton hvac system with like-for-like changeout; no structural change

    Replacement of complete existing central heat and air system with or without duct work **davis plowden: replace existing 2.5-ton hvac system with like-for-like changeout; no structural change

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 211 Tillery Sq

What is being built at 211 Tillery Sq?

The permit is for replacing the existing 2.5-ton HVAC system with a like-for-like system, not for a new building. It specifies no structural changes.

Is a new home being built at 211 Tillery Sq?

The City of Austin permit dated August 3, 2026, covers an HVAC system replacement. It does not describe new home construction.

What work does permit 2026-098274 MP cover?

It covers replacement of the existing central heat and air system with a like-for-like 2.5-ton HVAC system, with or without duct work. The permit specifies no structural changes.

When was the HVAC replacement at 211 Tillery Sq permitted?

The City of Austin issued mechanical permit 2026-098274 MP on August 3, 2026.

Is a new business opening at 211 Tillery Sq?

The available permit describes HVAC replacement at the address, not a new business opening.

What work is happening near 405 Tillery Street?

At 211 Tillery Sq, about 186 meters from 405 Tillery Street, a City of Austin permit covers a like-for-like replacement of the existing 2.5-ton HVAC system. The permit was issued August 3, 2026.

Also being built nearby

All of 78702
Email me when a new permit is filed