2213 Holly St
Austin, TX 78702
Withdrawn electrical permit for meter and riser repair
No new building is identified in the City of Austin record for 2213 Holly St. An electrical permit to repair the meter and riser was filed on April 1, 2026, and later withdrawn.
Summarized from City of Austin records · updated Apr 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2026
- since Apr 1, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit withdrawnRepair meter and riser
- AppliedMar 26, 2026
- IssuedApr 1, 2026
- !WorkApr '26 – Sep '26
- Final inspection
Marked withdrawn Jun 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepair meter and riser
Repair meter and riser
City of Austin permitElectrical PermitWithdrawn- Record
- 2026-036514 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2213 Holly St
What is being built at 2213 Holly St?
The available City of Austin record does not identify a new building. It lists a withdrawn electrical permit for meter and riser repair.
What work was permitted at 2213 Holly St in Austin?
Permit 2026-036514 EP was for repair of the meter and riser. It was filed on April 1, 2026, and its status is withdrawn.
Is there a new construction project at 2213 Holly St?
The available record lists one electrical permit for meter and riser repair, not a new construction project. The permit was withdrawn.
Was the electrical permit at 2213 Holly St approved?
The City of Austin record shows permit 2026-036514 EP as withdrawn. It was filed on April 1, 2026.
What does permit 2026-036514 EP cover?
The permit description is “Repair meter and riser.” The City of Austin record lists it as an electrical permit filed April 1, 2026.
Also being built nearby
All of 78702- 2209 Holly StDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 2217 Holly StFeb 19, 2026Replacement of an existing water heater · 25 m away
- 2210 Holly StJan 20, 2026Bathroom remodel: construct a bigger shower pan change from a single vanity to a double vanity update plumbing electrical and mechanical as per updated layout and per code build a shampoo niche build pony wall as per design new sconce lighting for vanity · 39 m away
- 2212 Holly StAug 25, 2026New construction in-ground pool · 43 m away
- 2205 Holly StApr 7, 2025Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 2206 Holly StJul 15, 2025New pool accessory to building 1 · 49 m away
- 2203 Holly StAug 13, 2026Replacement of an existing water heater replacing like/like g water heater in attic · 60 m away
- 2202 Holly StNov 23, 2025Installation of irrigation system · 68 m away
- 2210 Haskell StSep 24, 2025Replacement of complete existing central heat and air system with or without duct work 2 ton horizontal gas hvac changeout like for like · 69 m away
- 2218 Haskell StOct 5, 2026New pool · 73 m away
- 2300 Holly StDec 19, 2023Install an automatic irrigation system using city potable water · 79 m away
- 2308 Holly StDec 10, 2025Interior remodel (full scope on app) · 105 m away