2811 E 5th St
Austin, TX 78702 · Atelier Dojo, East 5th Street Facade
Warehouse conversion to artist workshop at 2811 E 5th St
Permits indicate a warehouse at 2811 E 5th St is being converted into an artist workshop, with tenant finish-out and an exterior facade remodel also permitted. The first building permit for the change of use was filed October 30, 2025, followed by related permits in December 2025.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Sep 22, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Sep 22, 2026
- since Aug 12, 2025
- Largest scope
- 1,500 sf
- Estimated cost
- $527K
- state registration
Permit & project history
11 projectsConstruct new driveway approach of 24 ft and sidewalk of 32 lf and curb & gutter of 56 ft. 2025 084244 da
Construct new driveway approach of 24 ft and sidewalk of 32 lf and curb & gutter of 56 ft. 2025 084244 da
City of Austin permitDriveway / SidewalksFinal- Record
- 2026-117078 DS
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install one single sided monument sign for fifth
Install one single sided monument sign for fifth
City of Austin permitElectrical PermitActive- Record
- 2026-107157 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from warehouse to artist workshop and tenant finish out
Change of use from warehouse to artist workshop and tenant finish out
City of Austin permitElectrical PermitFinal- Record
- 2025-133933 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Exterior remodel of a facade of an existing warehouse building. ****shell permit-building to contain 2 suites (permetted separately-hyatt
Exterior remodel of a facade of an existing warehouse building. ****shell permit-building to contain 2 suites (permetted separately-hyatt
City of Austin permitElectrical PermitFinal- Record
- 2025-158639 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from warehouse to artist workshop and tenant finish out
Change of use from warehouse to artist workshop and tenant finish out
City of Austin permitMechanical PermitFinal- Record
- 2025-133933 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from warehouse to artist workshop and tenant finish out
Change of use from warehouse to artist workshop and tenant finish out
City of Austin permitPlumbing PermitFinal- Record
- 2025-133933 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Exterior remodel of a facade of an existing warehouse building
Exterior remodel of a facade of an existing warehouse building
City of Austin permitBuilding PermitActive- Record
- 2025-138932 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from warehouse to artist workshop and tenant finish out
Change of use from warehouse to artist workshop and tenant finish out
City of Austin permitBuilding PermitActive- Record
- 2025-133933 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tenant finish out in existing building for artist workshop — fifth
TDLR project registrationRenovation/AlterationReview Complete1,500 sq ft$80K est.- Project #
- TABS2025025721
- Tenant / owner
- Atelier Dojo
- Design firm
- Pro
- Contact
- Pro
Facade renovation of existing pemb warehouse, includes site plan exception with new sidewalks. — fifth
TDLR project registrationRenovation/AlterationReview Complete1 sq ft$527K est.- Project #
- TABS2025025719
- Tenant / owner
- East 5th Street Facade
- Design firm
- Pro
- Contact
- Pro
Remove old lighting fixtures and replace with new led lighting and install ceiling fans removing about 20 of the old 8 fluorescent lights and installing 13- new led fixtures. replace the existing electrical services and system due to some unsafe conditions existing service is 120/240v 3ph 4w with a hi leg the high leg is being back fed thru a breaker system. changing for a more usable system 120/208v 3ph 4w and bringing up to todays codes. point of attachment is at 9 putting the drip loop at about 8 6 and one of them being the hi leg 240v to ground
Remove old lighting fixtures and replace with new led lighting and install ceiling fans removing about 20 of the old 8 fluorescent lights and installing 13- new led fixtures. replace the existing electrical services and system due to some unsafe conditions existing service is 120/240v 3ph 4w with a hi leg the high leg is being back fed thru a breaker system. changing for a more usable system 120/208v 3ph 4w and bringing up to todays codes. point of attachment is at 9 putting the drip loop at about 8 6 and one of them being the hi leg 240v to ground
City of Austin permitElectrical PermitFinal- Record
- 2023-122390 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 2811 E 5th St
What is being built at 2811 E 5th St in Austin?
Permits indicate an existing warehouse is being converted into an artist workshop with tenant finish-out. A separate permit covers an exterior facade remodel.
When was the artist workshop permitted at 2811 E 5th St?
The building permit for the warehouse-to-artist-workshop change of use was filed October 30, 2025, under permit 2025-133933 BP.
Is the warehouse at 2811 E 5th St being remodeled?
Yes. A building permit filed December 4, 2025, covers an exterior remodel of the existing warehouse facade. Permit 2025-138932 BP is listed as active.
What other work is permitted at 2811 E 5th St?
The records include electrical, mechanical, and plumbing permits for the artist workshop finish-out, plus a driveway and sidewalk permit filed September 22, 2026.
Is there a new sign planned at 2811 E 5th St?
An electrical permit filed August 31, 2026, describes installation of a single-sided monument sign. Permit 2026-107157 EP is listed as active.
What is happening near The Right Angle on East 5th Street?
At 2811 E 5th St, about 208 meters from The Right Angle, permits indicate a warehouse conversion to an artist workshop and an exterior facade remodel.
Also being built nearby
All of 78702- 408 N Pleasant Valley RdFeb 6, 2026Replace interceptor · 82 m away
- 404 N Pleasant Valley RdMay 18, 2025Interior remodel · 89 m away
- 2910 E 5th StSep 4, 2026Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet · 106 m away
- 2807 E 4th StOct 14, 2024Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 2902 E 4th StMay 1, 2025Manually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line · 116 m away
- 2715 Santa Rosa StJul 6, 2026Express: foundation repair · 124 m away
- 2709 E 5th StMar 9, 2026New tenant infill for personal training facility in three story multi use building. existing space has fire rated ceiling assembly to remain. adding gypsum board to two existing walls. adding accessible restrooms and storage cabinets. ste 110a · 126 m away
- 2710 Santa Rosa StMay 21, 2025Removal and replacement of the existing stucco facade. replacement of existing windows of a multi-family complex · 134 m away
- 2906 E 4th StJan 5, 2025Install irrigation system · 140 m away
- 505 N Pleasant Valley RdJun 18, 2025Access control addition · 147 m away
- 505 Pleasant Valley RdMar 2, 2007Capital metro expansion · 147 m away
- 306-1/2 BroadwayApr 24, 20202805/2807 east 4th alley improvement · 149 m away