2902 E 4th St
Austin, TX 78702
2902 E 4th St: 1 project on record
City of Austin lists 1 filing across 1 project at 2902 E 4th St, Austin, TX 78702. The most recent, filed May 1, 2025, covers: “Manually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line”.
Compiled from City of Austin records · updated May 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 1, 2025
- since May 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectManually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line
Manually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line
City of Austin permitPlumbing PermitFinal- Record
- 2025-051408 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2902 E 4th St
What is being built at 2902 E 4th St?
The latest filing (City of Austin permit 2025-051408 PP, May 1, 2025) covers manually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line.
How many permits and filings does 2902 E 4th St have?
1 filing across 1 project, from May 1, 2025 to May 1, 2025.
What is being built near Fifth in Austin?
2902 E 4th St is about 116 m from Fifth (2811 E 5th St). Its latest filing is for manually excavate up to 45 of main sewer line in front yard from perimeter of home to city tap at property line.
Is there other construction near 2902 E 4th St?
Yes. Nearby filings include 2906 E 4th St (install irrigation system, Jan 5, 2025); 2908 E 4th St (emergency electrical repairs are required for the existing overhead electrical service due to a damaged conductor and outdated equipment, Mar 19, 2026); 2910 E 4th St (install level 2 ev charger, Nov 10, 2026).
How do I get alerts for new permits at 2902 E 4th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 2906 E 4th StJan 5, 2025Install irrigation system · 28 m away
- 2908 E 4th StMar 19, 2026Emergency electrical repairs are required for the existing overhead electrical service due to a damaged conductor and outdated equipment · 42 m away
- 2910 E 4th StNov 10, 2026Install level 2 ev charger · 56 m away
- 306-1/2 BroadwayApr 24, 20202805/2807 east 4th alley improvement · 85 m away
- 2807 E 4th StOct 14, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 302 BroadwayJun 6, 2025T pole ref 2024-137390 bp · 105 m away
- 2811 E 5th StSep 22, 2026Construct new driveway approach of 24 ft and sidewalk of 32 lf and curb & gutter of 56 ft. 2025 084244 da · 116 m away
- 3100 East 5th Street · Capital MetroDec 17, 2024Capital metro tenant improvements & facility modifications for new headquarters phase 2 — renovation/alteration — interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite 100, suite 200, and suite 120 of the building. limited tas/tdlr and security improvements are also included on the 1st and 2nd floors · 121 m away
- 2910 E 5th StSep 4, 2026Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet · 128 m away
- 404 N Pleasant Valley RdMay 18, 2025Interior remodel · 152 m away
- 301 N Pleasant Valley RdJun 17, 2026Construct new driveway approach of 8 ft. driveway approach is from the alley · 159 m away
- 408 N Pleasant Valley RdFeb 6, 2026Replace interceptor · 164 m away