2910 E 5th St

Austin, TX 78702

Roof and truss repairs permitted at 2910 E 5th St

Permits indicate roof and structural repairs at the gas station at 2910 E 5th St, filed August 6 and September 4, 2026. The work includes replacing 13 corroded steel trusses and installing new roofing on the fuel, administrative, and fleet areas.

Summarized from City of Austin records · updated Sep 4, 2026

Projects
6
6 filings
Latest filing
Sep 4, 2026
since Dec 18, 2023
Largest scope
—
Listed value
—

Permit & project history

6 projects
  1. Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc membrane 3 fuel

    Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc membrane 3 fuel

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc membrane 1 admin

    Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc membrane 1 admin

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet

    Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Removal of thirteen corroded steel trusses. the existing roof will need to be removed to decommission the corroded steel trusses. installation of thirteen new steel trusses with an epoxy novolac coating to protect it from water chemical soaps and moisture. the new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope

    Removal of thirteen corroded steel trusses. the existing roof will need to be removed to decommission the corroded steel trusses. installation of thirteen new steel trusses with an epoxy novolac coating to protect it from water chemical soaps and moisture. the new roof will transition with the existing roof construction aligned with existing parapet walls and maintain a weathertight building envelope

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replace 120 of 2 gas yard line and gas test for texas gas

    Replace 120 of 2 gas yard line and gas test for texas gas

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Install two dedicated outlets for two vending machines

    Install two dedicated outlets for two vending machines

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2910 E 5th St

What is being built at 2910 E 5th St in Austin?

The permits describe repairs to the existing gas station, not a new building. Work includes replacing 13 corroded steel trusses and roofing on three areas of the property.

Is a new gas station being built at 2910 E 5th St?

The available permits describe repairs to existing structures, including truss replacement and roof work. They do not describe construction of a new gas station.

What are the roof permits for at 2910 E 5th St?

Three permits filed September 4, 2026, describe installing a new single-ply PVC roof membrane on the fuel, administrative, and fleet areas.

What structural work is planned at 2910 E 5th St?

Permit 2026-100761 BP, filed August 6, 2026, describes removing 13 corroded steel trusses and installing 13 new trusses with an epoxy novolac coating.

When were permits filed for work at 2910 E 5th St?

The first of the four listed permits was filed August 6, 2026. The other three were filed September 4, 2026.

What is being repaired near the Capmetro Paratransit Eligibility Center?

At 2910 E 5th St, about 237 meters from the Capmetro Paratransit Eligibility Center, permits indicate roof and structural repairs at a gas station. The filings cover truss replacement and roofing work.

Also being built nearby

All of 78702

More gas stations & car washes in 78702.

Get alerts for 2910 E 5th St