618-1/2 Tillery St
Austin, TX 78702
618-1/2 Tillery St: 5 projects on record
City of Austin lists 5 filings across 5 projects at 618-1/2 Tillery St, Austin, TX 78702 since August 5, 2008. The most recent, filed July 6, 2020, covers: “Install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved”.
Compiled from City of Austin records · updated Jul 6, 2020
- Projects
- 5
- 5 filings
- Latest filing
- Jul 6, 2020
- since Aug 5, 2008
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredInstall new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved
- AppliedJul 24, 2024
- IssuedFeb 13, 2026
- !WorkFeb '26 – Jul '26
- Final inspection
Marked expired Jul 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsInstall new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved
Install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved
City of Austin permitElectrical PermitExpired- Record
- 2025-083908 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade at&t cell phone equipment on an existing tower 2025 115552 da - approved
Upgrade at&t cell phone equipment on an existing tower 2025 115552 da - approved
City of Austin permitBuilding PermitActive- Record
- 2025-137671 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved
Install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved
City of Austin permitBuilding PermitExpired- Record
- 2025-083908 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 618-1/2 Tillery St
What is being built at 618-1/2 Tillery St?
The latest filing (City of Austin permit 2025-083908 EP, February 13, 2026) covers install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved.
How many permits and filings does 618-1/2 Tillery St have?
5 filings across 5 projects, from August 5, 2008 to July 6, 2020.
What is being built near Capital Metro in Austin?
618-1/2 Tillery St is about 123 m from Capital Metro (3100 East 5th Street). Its latest filing is for install new backup diesel generator on a new 4 x 10 concrete pad inside existing communication compound. install new automatic transfer switch. 2024 085177 da -approved.
Is there other construction near 618-1/2 Tillery St?
Yes. Nearby filings include 3100 E 5th St (interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf), Aug 4, 2025); 3100 East 5th Street (capital metro tenant improvements & facility modifications for new headquarters phase 2 — renovation/alteration — interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite 100, suite 200, and suite 120 of the building. limited tas/tdlr and security improvements are also included on the 1st and 2nd floors, Dec 17, 2024); 505 Tillery St (505 tillery street, Oct 12, 2015).
How do I get alerts for new permits at 618-1/2 Tillery St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 3100 E 5th StAug 4, 2025Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf) · 64 m away
- 3100 East 5th Street · Capital MetroDec 17, 2024Capital metro tenant improvements & facility modifications for new headquarters phase 2 — renovation/alteration — interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite 100, suite 200, and suite 120 of the building. limited tas/tdlr and security improvements are also included on the 1st and 2nd floors · 123 m away
- 505 Tillery StOct 12, 2015505 tillery street · 146 m away
- 2910 E 5th StSep 4, 2026Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet · 181 m away
- 405 Tillery Street · 405 Tillery St LLCJan 28, 2026Gallo east at 405 tillery street — renovation/alteration — exterior shell renovation of a metal building to include new insulated metal panels, metal roof, gutters, steel canopies, reinforced steel in structure, and accessible sidewalk. new transformer, water, and fire line to service the building as well · 183 m away
- 2910 E 4th StNov 10, 2026Install level 2 ev charger · 207 m away
- 2908 E 4th StMar 19, 2026Emergency electrical repairs are required for the existing overhead electrical service due to a damaged conductor and outdated equipment · 219 m away
- 3203 Holton StAug 13, 2024Replacing 200amp meter and riser from tree that fell down · 219 m away
- 2906 E 4th StJan 5, 2025Install irrigation system · 227 m away
- 3201 Holton StJun 24, 2024New inground swimming pool with reqd enclosure device for 2-story sfr. *heating/autofill · 229 m away
- 505 N Pleasant Valley RdJun 18, 2025Access control addition · 239 m away
- 505 Pleasant Valley RdMar 2, 2007Capital metro expansion · 239 m away