3100 E 5th St
Austin, TX 78702
Interior fit-outs and building upgrades at 3100 E 5th St
City of Austin permits filed in July and August 2025 indicate interior fit-outs in several suites at 3100 E 5th St. Work includes architectural and mechanical, electrical and plumbing improvements, plus accessibility and security upgrades and exterior egress improvements. The records do not identify tenants or a new use for the building.
Summarized from City of Austin records · updated Aug 4, 2025
- Projects
- 21
- 21 filings
- Latest filing
- Aug 4, 2025
- since Oct 22, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
21 projectsInterior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
City of Austin permitElectrical PermitFinal- Record
- 2025-091280 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
City of Austin permitElectrical PermitFinal- Record
- 2025-091282 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
City of Austin permitElectrical PermitFinal- Record
- 2025-091281 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
City of Austin permitMechanical PermitFinal- Record
- 2025-091280 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
City of Austin permitMechanical PermitFinal- Record
- 2025-091281 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
City of Austin permitPlumbing PermitFinal- Record
- 2025-091281 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
City of Austin permitPlumbing PermitFinal- Record
- 2025-091280 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
City of Austin permitPlumbing PermitFinal- Record
- 2025-091282 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
City of Austin permitMechanical PermitFinal- Record
- 2025-091282 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
City of Austin permitPlumbing PermitFinal- Record
- 2025-072698 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
Interior fit-out including architectural and mep improvements. suite 120 (on 1st floor 1389sf)
City of Austin permitBuilding PermitFinal- Record
- 2025-091281 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
Interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite100 (on 1st floor 12308sf)
City of Austin permitBuilding PermitFinal- Record
- 2025-091280 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
Suite 200(on 2nd floor 22243sf). limited tas/tdlr and security improvements on both floors. improvements include: accessibility revision to restrooms; addition of card readers & security cameras. there is a glass enclosure at existing elevators lobby from 1st floor up to existing roof; screen protection added at existing stairs. exterior improvement includes addition of ev charging station dumpster structure and addition for safety egress of compliant ramp and stair on north side of building
City of Austin permitBuilding PermitFinal- Record
- 2025-091282 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
City of Austin permitMechanical PermitFinal- Record
- 2025-072698 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
City of Austin permitElectrical PermitFinal- Record
- 2025-072698 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
Interior fit-out including architectural and mep improvements of the southeast corner of first floor approx 8900 sq ft fit-out for this phase is limited to suite 180 located on the 1st floor. the main improvements include assembly and business spaces and support paces. other improvements include new exterior doors hand railing and addition of card readers and security cameras. limited tas/tdlr and security improvements also included
City of Austin permitBuilding PermitFinal- Record
- 2025-072698 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
City of Austin permitElectrical PermitFinal- Record
- 2024-085071 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
City of Austin permitPlumbing PermitFinal- Record
- 2024-085071 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
City of Austin permitMechanical PermitFinal- Record
- 2024-085071 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
Interior fit-out including architectural and mep improvements to white box space. fit-out is limited to suite 300 located on 3rd floor. suite 320 and an egress corridor are included for fire life safety purposes only. limited tas/tdlr and security improvements are also included on the first floor to support the occupancy of the 3rd floor. the first floor improvements include accessibility revisions to the restroom
City of Austin permitBuilding PermitFinal- Record
- 2024-085071 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace burned 800 amp 480 volt non fusible disconnect
Replace burned 800 amp 480 volt non fusible disconnect
City of Austin permitElectrical PermitExpired- Record
- 2023-079599 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3100 E 5th St
What is being built at 3100 E 5th St in Austin?
City permits indicate interior fit-outs in suites 100, 120, 180 and 200, along with accessibility, security and exterior improvements. The records describe work to an existing building, not a new building.
What work is happening in Suite 100 at 3100 E 5th St?
Permits filed July 31 and August 1 and 4, 2025, cover an interior fit-out with architectural, mechanical, electrical and plumbing improvements. The described area is 12,308 square feet.
What improvements are planned for Suite 200?
Permits filed August 1 and 4, 2025, describe work in the 22,243-square-foot second-floor suite, including restroom accessibility revisions, card readers and security cameras. The plans also list an elevator-lobby glass enclosure, stair screening, an EV charging station, a dumpster structure, and a compliant ramp and stair for safe egress.
What is being changed in Suite 180 at 3100 E 5th St?
A permit filed August 1, 2025, describes an approximately 8,900-square-foot first-floor fit-out for assembly and business spaces and support areas. Listed improvements include exterior doors, hand railing, card readers and security cameras.
Is a new business opening at 3100 E 5th St?
The available City of Austin permits describe suite fit-outs and building upgrades but do not name a tenant or identify a new business.
What work is happening near Gallo East on Tillery Street?
At 3100 E 5th St, about 220 meters from Gallo East at 405 Tillery Street, City of Austin permits filed in July and August 2025 indicate interior suite fit-outs and accessibility, security and exterior upgrades.
Also being built nearby
All of 78702- 618-1/2 Tillery StJul 6, 2020Bradco roofing; telecommunications tower · 64 m away
- 505 Tillery StOct 12, 2015505 tillery street · 156 m away
- 3203 Holton StAug 13, 2024Replacing 200amp meter and riser from tree that fell down · 164 m away
- 3201 Holton StJun 24, 2024New inground swimming pool with reqd enclosure device for 2-story sfr. *heating/autofill · 169 m away
- 3100 East 5th Street · Capital MetroDec 17, 2024Capital metro tenant improvements & facility modifications for new headquarters phase 2 — renovation/alteration — interior fit-out including architectural and mep improvements. fit-out for this phase is limited to suite 100, suite 200, and suite 120 of the building. limited tas/tdlr and security improvements are also included on the 1st and 2nd floors · 184 m away
- 604 Allen StMay 12, 2013604 allen street · 214 m away
- 3210 Holton StJan 25, 2024Eplan: expedited review - interior remodel - change of use from warehouse to admin space (1467 sq ft) · 218 m away
- 405 Tillery Street · 405 Tillery St LLCJan 28, 2026Gallo east at 405 tillery street — renovation/alteration — exterior shell renovation of a metal building to include new insulated metal panels, metal roof, gutters, steel canopies, reinforced steel in structure, and accessible sidewalk. new transformer, water, and fire line to service the building as well · 220 m away
- 610 Allen StOct 16, 2026Installation of a generac 18kw with 150 amp ats · 226 m away
- 2910 E 5th StSep 4, 2026Remove existing pvc and fanfold cover board down to original bur mechanically attach fan fold and 50mil single-ply pvc. 2 fleet · 226 m away
- 605 Allen StJan 4, 2024Re-roof (40 squares/ shingles only) · 259 m away
- 640 Allen StNov 5, 2026New clubhouse (remodel) · 261 m away