2938 East 13th St
Austin, TX 78702 · Mt. Zion Baptist Church Family Life Center
Mt. Zion Baptist Church plans 9,835-square-foot gym addition
A 9,835-square-foot, steel-framed gymnasium addition to Mt. Zion Baptist Church is listed in a TDLR project registration dated November 29, 2024. The registration describes it as part of a family life center and includes associated infrastructure and site work. The applicant's estimated project cost is $3.9 million.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 29, 2024
- since Nov 29, 2024
- Largest scope
- 9,835 sf
- Estimated cost
- $3.9M
- state registration
Where this project stands
Inspected · closing outMt. Zion Baptist Church
9,835 sq ft · $3.9M est.
- RegisteredNov 29, 2024
- Plan review
- ConstructionJan '25 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew steel framed gymnasium addtion to existing steel framed church and associated infrastructure and site work improvements (9,835 sq ft) — family life center
TDLR project registrationAdditions to Existing BuildingInspection Complete9,835 sq ft$3.9M est.- Project #
- TABS2025006568
- Tenant / owner
- Mt. Zion Baptist Church
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2938 East 13th St
What is being built at 2938 East 13th St in Austin?
A 9,835-square-foot steel-framed gymnasium addition to Mt. Zion Baptist Church is listed in a TDLR registration dated November 29, 2024.
Is Mt. Zion Baptist Church getting a new gym in Austin?
The TDLR project registration describes a new gymnasium addition to the existing church as part of a family life center.
How big is the Mt. Zion Baptist Church addition?
The registered project is 9,835 square feet and includes associated infrastructure and site work improvements.
When was the Mt. Zion Baptist Church project filed?
The TDLR registration for project TABS2025006568 is dated November 29, 2024.
How much will the church addition cost?
The applicant's estimated cost for the project is $3.9 million. This is an estimate listed in the TDLR registration.
Is the Mt. Zion Baptist Church gym addition complete?
The TDLR record lists the project status as “Inspection Complete.”
Also being built nearby
All of 78702- 2926 E 13th StFeb 2, 2024Express: replace 4 windows like for like · 19 m away
- 2925 E 13th StFeb 4, 2026Interior remodel (detailed scope attached) · 40 m away
- 1303 Clifford AveOct 9, 2024Express: change handing of front exterior door from right swing to left swing (same size) · 41 m away
- 2933 E 13th StApr 27, 2026Express: foundation repair · 61 m away
- 2920 E 13th StJul 29, 2024Replacement of mini-split system · 71 m away
- 2938 E 13th StOct 9, 2025Additon to create accessory use for church · 74 m away
- 2921 E 14th StNov 9, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 14 seer2 single stage condenser evaporator coil and gas furnace · 100 m away
- 2924 E 14th StJul 21, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 106 m away
- 2922 E 12th StApr 8, 2025Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 2914 E 13th StJan 2, 2024Construct new driveway approach of 16 ft. no sidewalk inspection per plan review. *rs · 107 m away
- 2930 E 12th StMar 14, 2024Replacing one window of the same size and same location like for like · 109 m away
- 2918 E 12th StAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 118 m away