groundranger
Active · latest filing Oct 2026Residential

3003 Glen Rae St

Austin, TX 78702

Bathroom remodel permitted at 3003 Glen Rae St

City of Austin permits indicate an interior remodel to expand the existing primary bathroom into an adjacent closet. The building permit was filed October 16, 2026, followed by plumbing and electrical permits on October 28, 2026.

Summarized from City of Austin records · updated Oct 28, 2026

Projects
3
3 filings
Latest filing
Oct 28, 2026
since Oct 16, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

  1. AppliedOct 7, 2026
  2. IssuedOct 28, 2026
  3. WorkOct '26 – May '27
  4. Final inspection
12% through of the permit windowOct 28, 2026 → May 4, 2027

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    Interior remodel expand existing primary bathroom into adjacent closet close closet doorway and remove wall between bath and closet relocate vanity to current closet location with plumbing and electrical reconfiguration shower and toilet remain in existing location

    City of Austin permitBuilding PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3003 Glen Rae St

What is being built at 3003 Glen Rae St in Austin?

Permits indicate an interior remodel of the existing primary bathroom, expanding it into an adjacent closet. The work includes relocating the vanity and reconfiguring plumbing and electrical.

Is 3003 Glen Rae St getting a new bathroom?

The permits describe an expansion of the existing primary bathroom, not a separate new bathroom. The shower and toilet are to remain in their existing locations.

When were permits filed for the remodel at 3003 Glen Rae St?

The building permit, 2026-135052 BP, was filed October 16, 2026. Plumbing permit 2026-135052 PP and electrical permit 2026-135052 EP were filed October 28, 2026.

What changes are planned for the bathroom at 3003 Glen Rae St?

The permit description says the remodel will close the closet doorway, remove the wall between the bathroom and closet, and move the vanity into the current closet area. Plumbing and electrical will be reconfigured.

Are the shower and toilet being moved at 3003 Glen Rae St?

No. The permit description says the shower and toilet will remain in their existing locations.

Also being built nearby

All of 78702
Email me when it passes final inspection