3007 Garwood St
Austin, TX 78702
Level 2 EV charger permitted at 3007 Garwood St
A Level 2 electric vehicle charger is being installed at 3007 Garwood St. The City of Austin electrical permit was filed on September 29, 2025, and is marked final.
Summarized from City of Austin records · updated Sep 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2025
- since Sep 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedSep 24, 2025
- IssuedSep 29, 2025
- WorkSep '25 – Mar '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-121629 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3007 Garwood St
What is being built at 3007 Garwood St in Austin?
A City of Austin permit records the installation of a Level 2 electric vehicle charger at the residential address. The permit was filed September 29, 2025.
Is an EV charger being installed at 3007 Garwood St?
Yes. Electrical Permit 2025-121629 EP is for installing a Level 2 EV charger and is marked final.
When was the permit for the 3007 Garwood St EV charger filed?
The City of Austin filed the permit on September 29, 2025.
What type of EV charger is planned for 3007 Garwood St?
The permit describes a Level 2 EV charger installation.
Will the charger at 3007 Garwood St be open to the public?
The permit record identifies a residential EV charger installation but does not say whether the charger will be publicly accessible.
How much will the EV charger installation at 3007 Garwood St cost?
The available permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 78702- 3009 Garwood StMay 5, 2025Installation of residential ev charger on exterior of home · 14 m away
- 3001 Garwood StMar 6, 2025(fox-baker danny)- installation of circuit for elec. vehicle charging station - esip · 15 m away
- 3019 Garwood StDec 15, 2025New inground swimming pool with reqd enclosure device. *autofill/heating · 43 m away
- 3008 Gonzales StDec 19, 2023Replace existing grease interceptor (gi) with new 1000-gallon gi · 45 m away
- 714 Ramos StJul 28, 2026Replacement of complete existing central heat and air system with or without duct work 1 system · 51 m away
- 3023 Garwood StOct 30, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4.5bath] with covered porch. building 2 · 55 m away
- 680 Ramos StOct 13, 2025Replacement of mini-split system residential mini-split apt 1 · 79 m away
- 3103 Garwood StSep 21, 2026New irrigation system a combination of drip and spray heads · 86 m away
- 3100 Garwood StSep 17, 2026Cap offs with ww · 93 m away
- 3019 Prado StApr 16, 2026150amp service upgrade install co/smokes gfci protect kitchen · 115 m away
- 2902 Gonzales StMar 6, 2026Express: replace 8 windows (like for like) · 140 m away
- 2819 Garwood StFeb 6, 2026Gas line feeding off meter to fire pit. wrapped with tracer wire set at 18. left on test for inspection · 143 m away