groundranger
Recent · latest filing Jun 2026Residential

3303 Neal St

Austin, TX 78702

Solar installation and structure demolition at 3303 Neal St

Austin permits filed Jan. 14 and 16, 2026, indicate installation of a 15.225-kW solar system with one Tesla Powerwall 3 and one DC expansion. A separate permit filed June 10, 2026, covers demolition of a detached 483-square-foot structure built circa 1952.

Summarized from City of Austin records · updated Jun 10, 2026

Projects
3
3 filings
Latest filing
Jun 10, 2026
since Jan 14, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Total demolition of detached structure 483 sq ft circa 1952

  1. AppliedMay 18, 2026
  2. IssuedJun 10, 2026
  3. WorkJun '26 – Jul '26
  4. Final inspectionJul 30, 2026

Passed final inspection Jul 30, 2026.

2 contacts on this project · 2 phone numbers

Permit & project history

3 projects
  1. Total demolition of detached structure 483 sq ft circa 1952

    Total demolition of detached structure 483 sq ft circa 1952

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect. installing a 15.225 kw pv solar system 1 tesla pw 3 and 1 tesla dc expansion

    Request to disconnect. installing a 15.225 kw pv solar system 1 tesla pw 3 and 1 tesla dc expansion

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installing a 15.225 kw pv solar system 1 tesla pw 3 and 1 tesla dc expansion

    Installing a 15.225 kw pv solar system 1 tesla pw 3 and 1 tesla dc expansion

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3303 Neal St

What is happening at 3303 Neal St in Austin?

Austin permits indicate a 15.225-kW solar installation and demolition of a detached structure. The solar permits were filed Jan. 14 and 16, 2026; the demolition permit was filed June 10, 2026.

Is a new home being built at 3303 Neal St?

The records provided show solar installation and demolition of a detached structure, but no new-home permit for this address.

What solar system is planned at 3303 Neal St?

The electrical permit describes a 15.225-kW photovoltaic solar system with one Tesla Powerwall 3 and one Tesla DC expansion. Permit 2026-003303 EP was filed Jan. 14, 2026.

What structure is being demolished at 3303 Neal St?

Permit 2026-067282 BP covers total demolition of a detached 483-square-foot structure dating to circa 1952. It was filed June 10, 2026.

What is being built near Voices Rising in Austin?

At 3303 Neal St, near Voices Rising at 3404 Govalle Ave, permits indicate a 15.225-kW solar installation. A separate permit covers demolition of a detached structure.

What does permit 2026-005778 EP cover at 3303 Neal St?

The electrical permit, filed Jan. 16, 2026, requests a disconnect and describes the 15.225-kW solar system with one Tesla Powerwall 3 and one DC expansion.

Also being built nearby

All of 78702

More demolitions in 78702, solar installs in 78702.

Email me when a new permit is filed