3615-1/2 Lyons Rd
Austin, TX 78702
Mokan Corridor trail bridge planned at Lyons Road
A prefabricated steel pedestrian bridge and retaining wall are planned at 3615-1/2 Lyons Road as part of Mokan Corridor Trail Phase 5: Boggy Creek Bridge. The City of Austin issued a building permit for the bridge on March 2, 2026, and approved and released the site plan on August 6, 2026.
Summarized from City of Austin records · updated Aug 6, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 6, 2026
- since Aug 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew construction of a prefabricated steel pedestrian bridge and retaining wall
- AppliedFeb 17, 2026
- IssuedMar 2, 2026
- WorkMar '26 – Oct '26
- Final inspectionOct 26, 2026
Passed final inspection Oct 26, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsNew construction of a prefabricated steel pedestrian bridge and retaining wall
New construction of a prefabricated steel pedestrian bridge and retaining wall
City of Austin permitBuilding PermitFinal- Record
- 2026-023884 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temporary building permit scope of permit is limited to drill hole place rebar and pour concrete piers supporting and prefabricated pedestrian bridge in accordance with the structural design plans
Temporary building permit scope of permit is limited to drill hole place rebar and pour concrete piers supporting and prefabricated pedestrian bridge in accordance with the structural design plans
City of Austin permitBuilding PermitExpired- Record
- 2026-020411 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3615-1/2 Lyons Rd
What is being built at 3615-1/2 Lyons Road?
City of Austin records describe a prefabricated steel pedestrian bridge and retaining wall for Mokan Corridor Trail Phase 5: Boggy Creek Bridge.
Is a new bridge planned on Lyons Road in Austin?
Yes. A City of Austin building permit dated March 2, 2026, describes construction of a prefabricated steel pedestrian bridge and retaining wall.
What is Mokan Corridor Trail Phase 5?
The City of Austin case at this address names the project Mokan Corridor Trail Phase 5: Boggy Creek Bridge. Its site plan was approved and released on August 6, 2026.
When was the Lyons Road bridge permitted?
The bridge building permit, 2026-023884 BP, was issued March 2, 2026. The related site plan case, 13440983, was approved and released August 6, 2026.
Is the pedestrian bridge permit approved?
The building permit 2026-023884 BP is listed as Final. A separate temporary permit for drilling and pouring the bridge-support piers, 2026-020411 BP, is listed as Expired.
Also being built nearby
All of 78702- 3600 Lyons RdNov 21, 2025Emergency repair of oh meter and service for railroad · 57 m away
- 900 Springdale RdApr 22, 2026Install a pergola with solar panels attached to the top this project is being installed for the following ae account + unit # (even though the address is correctly entered in the permitting system): 900 springdale rd unit foodt austin tx 78702 -- per megan brannen with austin energy 5/11/2026 · 63 m away
- 3509 Lyons RdMay 31, 2024Express: wheelchair ramp · 118 m away
- 906 Gunter StJan 30, 2024Construct new driveway approach of 10 ft. no sidewalk inspection per plan review · 141 m away
- 3505 Lyons RdDec 23, 2025Gas test. meter pulled out · 148 m away
- 831 Springdale RdNov 13, 2025Gas pressure test for school only · 162 m away
- 4609 Lyons RdSep 3, 2026Demolition old approach. construct new driveway approach of 14.5 ft · 170 m away
- 905 Chote AveMar 14, 2025Cap off water and waste water · 186 m away
- 4603-1/2 Milburn LnApr 4, 2024Springdale salon · 201 m away
- 4612 Lyons RdDec 17, 2025New inground swimming pool with reqd enclosure device for 2-story sfr · 216 m away
- 916 Springdale RdDec 16, 2025Tenant finish-out of small ground-level commercial space with new partition walls. millwork and doors in existing canopy office building 4 requesting quick turnaround permit due to limited scope no required mechanical electrical structural or fire modifications · 216 m away
- 812 Springdale RdAug 19, 2025Replacement of any self-contained packaged units replacing 7-ton addison with new like-for-like 7-ton addison · 219 m away